FILTER BY
Year
Month
Type
NO.
Description
Contractor
Amount
2024
September
Construction & Maintenance
Interchanges 14, 15E and 17E Toll Island and Pavement Repairs
Joseph M. Sanzari. Inc.
$1,198,800.00
2024
August
Construction & Maintenance
Rehabilitation of Southbound Driscoll Bridge MSE Walls, Str. No. 127.2S Milepost 126.9S to 127.8S
Ferreira Construction Co. Inc.
$895,472.00
2024
July
Construction & Maintenance
Underground Storage Tank Removal and Replacement Turnpike Maintenance District 4 and Law Enforcement Center Milepost 67.8 SB and 71.8 SB
T. Slack Environmental Services
$2,116,865.00
2024
June
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features and Sign Structures on The New Jersey Turnpike
Creamer Ruberton, A Joint Venture
$10,464,532.00
2024
June
Construction & Maintenance
Roadway Lighting Improvements at Turnpike Northern and Southern Mixing Bowls Mileposts 115.9 to 117.7 and 105.3 to 106.6
HBC Company Inc
$17,947,517.10
2024
June
Construction & Maintenance
Bridge Line Striping Installation and Maintenance on the New Jersey Turnpike
Zone Striping, Inc.
$857,333.77
2024
May
Construction & Maintenance
Replacement of State Police Substations and Site Improvements, Pleasant Plains, Milepost 83.8, Avalon, Milepost 14.0, and The Celia Cruz Service Area, Milepost 76.2
Hall Building Corp.
$11,364,211.40
2024
April
Construction & Maintenance
On Call HVAC Controls Repairs
A.M.E. Inc.
1.50%
2024
April
Construction & Maintenance
Immediate and Scheduled Repairs of Facilities
Joseph M. Sanzari, Inc.
4.99%
2024
February
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 Section 7 (2024)
C.J. Hesse, Inc.
$25,959,019.62
2024
February
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2024)
Stavola Contracting Co., Inc.
$5,806,569.69
2024
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2024)
Ferreira Construction Co. Inc.
$10,587,472.00
2024
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 92, and the Pearl Harbor Memorial Turnpike Extension (2024)
Ferreira Construction Co. Inc.
$15,247,211.00
2024
January
Construction & Maintenance
Milepost 92 Pump Station Repairs
RML Construction, Inc.
$3,892,910.00
2023
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2024)
Joseph M. Sanzari, Inc.
$21,904,000.00
2023
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172 (2024)
IEW Construction Group Inc.
$13,698,593.04
2023
December
Construction & Maintenance
Replacement of Structure No. W112.72B Milepost W112.0 to W112.7
PKF-Mark III, Inc.
$69,630,889.00
2023
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 83 Section 5 (2024)
Stavola Contracting Co., Inc.
$17,986,484.69
2023
December
Construction & Maintenance
Replacement of Two Waterway Piers Turnpike Structure No. W115.36 & Miscellaneous Improvements
PKF-Mark III, Inc.
$47,769,980.00
2023
December
Construction & Maintenance
Guide Rail Improvements New Jersey Turnpike Milepost 0 to 122 Garden State Parkway Milepost 0 to 172
J. Fletcher Creamer & Son, Inc.
$2,774,130.00
2023
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 83 Section 7 (2024)
Earle Asphalt Company
$18,875,513.13
2023
December
Construction & Maintenance
Solar Pilot Program & Roof Replacement at Various Locations
Kane Communications LLC
$3,126,350.00
2023
November
Construction & Maintenance
Lighting Improvements at Interchange 15E and Interchange 15W Milepost 106.0 to 107.5, Milepost 107.5 to 109.1
Daidone Electric, Inc.
$21,880,000.00
2023
November
Construction & Maintenance
Roadway Stabilization and Reprofiling Improvements Milepost 97 to 98 and 102 to 104.5
Crisdel Group, Inc.
$51,865,330.00
2023
November
Construction & Maintenance
Snow Trailer Electrical Improvements
HBC Company Inc
$1,490,200.00
2023
September
Construction & Maintenance
Lighting Improvements at Service Area 10S and Interchange 13A Milepost 92.4 to 93.4 and Milepost 101.1 to 102.5
PKF-Mark III, Inc.
$21,517,691.00
2023
September
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 169.2 to 171.7
Joseph M. Sanzari, Inc.
$13,377,000.00
2023
August
Construction & Maintenance
Rehabilitation of Concrete Median Barrier, Milepost 134 to 140
Crisdel Group, Inc.
$64,507,212.00
2023
July
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features on The Garden State Parkway
Creamer Ruberton, A Joint Venture
$11,749,960.00
2023
July
Construction & Maintenance
Waterway Substructure Rehabilitation of Turnpike Structures W110.42 and W111.48
Agate Construction Co., Inc.
$6,027,282.00
2023
July
Construction & Maintenance
Roadway Resurfacing Maybaum Avenue and Parkway Drive Northbound North Clinton Street and Parkway Drive Southbound
Stavola Contracting Co., Inc.
$944,572.69
2023
June
Construction & Maintenance
Drainage Video Inspection and Cleaning Milepost 105.3 to 122
Mount Construction Co., Inc.
$6,488,431.00
2023
May
Construction & Maintenance
Bassett Building and Turnpike Central, Southern Trades Shop Renovations
Hall Building Corp.
$3,366,950.00
2023
April
Construction & Maintenance
Underground Storage Tank Removal and Replacement Turnpike Maintenance District 2 Milepost 37.0 NB
T. Slack Environmental Services
$1,201,335.00
2023
April
Construction & Maintenance
Culvert Repairs Milepost W112.72N
Mount Construction Co., Inc.
$4,899,431.00
2023
April
Construction & Maintenance
Immediate and Scheduled Repairs of Drainage Structures and Underground Facilities
Joseph M. Sanzari, Inc.
3.45%
2023
April
Construction & Maintenance
Immediate and Scheduled Roadway and Structure Repairs
Joseph M. Sanzari, Inc.
3.45%
2023
April
Construction & Maintenance
Maintenance and Repair of Traffic Signals On The New Jersey Turnpike and Garden State Parkway
Jen Electric. Inc.
$398,140.00
2023
March
Construction & Maintenance
Maintenance and Repair of Storm Water Systems
Mount Construction Co., Inc.
$5,598,400.00
2023
March
Construction & Maintenance
Line Striping Installation and Maintenance on the New Jersey Turnpike and Garden State Parkway
Traffic Lines, Inc.
$7,824,000.00
2023
March
Construction & Maintenance
Roof Replacement at Interchange 14 Toll Canopy and TMD6 Landscape Shop
Detwiler Roofing, LLC
$2,994,600.00
2023
February
Construction & Maintenance
Culvert Repairs Interchange 100
Carbro Constructors Corp.
$10,832,507.00
2023
February
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2023)
Stavola Contracting Co., Inc.
$5,542,959.69
2023
February
Construction & Maintenance
Construction of Pre-Engineered Metal Building Trades Shop at Barnegat Tolls
Hall Building Corp.
$1,380,869.00
2023
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 92, and the Pearl Harbor Memorial Turnpike Extension (2023)
Ferreira Construction Co. Inc.
$9,783,472.00
2023
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2023)
Joseph M. Sanzari, Inc.
$9,599,585.00
2023
January
Construction & Maintenance
2022 HVAC Upgrades at Various Locations
ACP Contracting Inc.
$2,315,991.00
2023
January
Construction & Maintenance
Roadway Resurfacing, Milepost 0 to 83 Section 4 (2023)
Earle Asphalt Company
$26,815,513.13
2023
January
Construction & Maintenance
Roadway Resurfacing, Milepost 126 to 172 Section 14 (2023)
Stavola Contracting Co., Inc.
$23,601,469.69
2022
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172 (2023)
Joseph M. Sanzari, Inc.
$11,143,787.00
2022
December
Construction & Maintenance
Headquarters Elevator Replacement
Champion Elevator Corp.
$2,821,848.07
2022
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2023)
Joseph M. Sanzari, Inc.
$17,819,148.80
2022
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 To 83 Section 2 (2023)
South State, Inc.
$16,891,209.00
2022
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 To 126 Section 4 (2023)
C. J. Hesse, Inc.
$34,479,019.62
2022
November
Construction & Maintenance
Roadway Lighting Repairs Interchanges 10 & 11 Mileposts 87.4 to 88.9 and 90.1 to 92.2
Daidone Electric, Inc.
$13,898,000.00
2022
October
Construction & Maintenance
Culvert Repairs Milepost 109 to 124
Carbro Constructors Corp.
$17,717,305.70
2022
September
Construction & Maintenance
Demolition of Former Turnpike Administration Building MP 83.2 SB
A.P.S. Contracting Inc.
$4,436,287.00
2022
September
Construction & Maintenance
Watermain Replacements on the Garden State Parkway and New Jersey Turnpike Various Locations
Crisdel Group, Inc.
$1,494,504.95
2022
August
Construction & Maintenance
Turnpike Drainage Video Inspection and Cleaning, MP 0.0 to MP 36.5
Mount Construction Co., Inc.
$2,899,431.00
2022
July
Construction & Maintenance
Curve Advisory Sign Installation New Jersey Turnpike Milepost 90.9 to 119.1 and Milepost N7.7 to N7.9 Garden State Parkway Milepost 130.0 to 160.2
J. Fletcher Creamer & Son, Inc.
$5,245,075.00
2022
July
Construction & Maintenance
Immediate And Scheduled Repairs (2022), Milepost 0 to 122 New Jersey Turnpike and Milepost 0 to 172 Garden State Parkway
Mount Construction Co., Inc.
1.58%
2022
June
Construction & Maintenance
Garden State Parkway Service Area Ramp Widenings
D'Annunzio & Sons, Inc.
$27,997,000.00
2022
June
Construction & Maintenance
Turnpike Interchange 13, 15W and Northern Division Headquarters Generator Replacement
HBC Company Inc
$2,506,980.00
2022
June
Construction & Maintenance
Lighting Improvements and Standby Generator Replacement at Turnpike Interchange 17E, Milepost E112.8
HBC Company Inc
$8,788,869.65
2022
May
Construction & Maintenance
Miscellaneous Garage and Vehicle Wash Upgrades PMD 6 MP 136.7 SB, TMD 10 MP 16W WS TMD 7 MP 104 .9 SB and Cranbury State Police MP 71 .0 SB
H & S Construction and Mechanical
$4,465,420.00
2022
May
Construction & Maintenance
Deck Reconstruction, Milepost 98.4 to 98.7
Schiavone Construction Co. LLC
$72,756,960.00
2022
April
Construction & Maintenance
Drainage Rehabilitation and Sliplining, Milepost 110.6 TO 116.4
Union Paving & Construction Co., Inc.
$9,154,559.10
2022
April
Construction & Maintenance
Drainage Video Inspection and Cleaning Milepost 120.6 to 123.6
Mount Construction Co., Inc.
$1,463,431.00
2022
April
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features on the New Jersey Turnpike
Creamer Ruberton, A Joint Venture
$13,996,740.00
2022
March
Construction & Maintenance
Underground Storage Tank Removal and Replacement Parkway Maintenance District 8
Aurora Environmental, Inc.
$526,321.00
2022
March
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2022)
Stavola Contracting Co., Inc.
$5,348,879.98
2022
January
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 83 Section 3 (2022)
South State, Inc.
$17,673,389.00
2022
January
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 Section 6 (2022)
Earle Asphalt Company
$20,555,513.13
2022
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 92, and the Pearl Harbor Memorial Turnpike Extension (2022)
Ferreira Construction Co. Inc.
$9,600,000.00
2022
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2022)
IEW Construction Group Inc.
$9,225,451.14
2022
January
Construction & Maintenance
Parkway Bridge Deck and Superstructure Reconstruction Milepost 124.4 to 128.1
Joseph M. Sanzari, Inc.
$60,950,732.50
2021
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2022)
Joseph M. Sanzari, Inc.
$15,232,198.00
2021
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172 (2022)
IEW Construction Group Inc.
$9,243,381.83
2021
December
Construction & Maintenance
Roadway Lighting Repairs Interchanges 7A & 8A
Daidone Electric, Inc.
$6,948,000.00
2021
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 83 Section 1 (2022)
Richard E. Pierson Construction Co., Inc.
$10,977,752.00
2021
December
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 Section 1 (2022)
South State, Inc.
$8,942,246.50
2021
December
Construction & Maintenance
Bridge Deck Reconstruction, Milepost 83 to 88
D'Annunzio & Sons, Inc.
$172,657,000.00
2021
November
Construction & Maintenance
Turnpike Deck Reconstruction, Milepost 90.0 to 91.37
Ferreira Construction Co. Inc.
$31,472,110.00
2021
November
Construction & Maintenance
Culvert Repairs, Milepost 112 to 113
Carbro Constructors Corp.
$7,828,594.00
2021
October
Construction & Maintenance
Roof Replacement at Parkway East Orange Toll Plaza Milepost 147
USA General Contractors Corp
$635,000.00
2021
October
Construction & Maintenance
Roadway Lighting Repairs Interchanges 12 and 13 Mileposts 95.3 to 96.5 and 97.8 to 100.2
Daidone Electric, Inc.
$8,988,000.00
2021
September
Construction & Maintenance
Rehabilitation of Concrete Median Barrier, Milepost 89 to 122
Ferreira Construction Co. Inc.
$2,895,472.00
2021
September
Construction & Maintenance
Culvert Rehabilitation Mileposts 115.80, 115.80A, 115.81
Roman E&G Corp.
$9,440,645.37
2021
September
Construction & Maintenance
Parkway Bridge Superstructure Replacement Milepost 106.3 to 106.5
Earle Asphalt Company
$16,999,613.13
2021
August
Construction & Maintenance
Bridge Deck and Superstructure Reconstruction Milepost 35.5 to 44.1
IEW Construction Group Inc.
$20,136,533.09
2021
August
Construction & Maintenance
Interim Repairs of Waterway Pier Structure No. W115.36 - Western Hackensack River Bridge
PKF-Mark III, Inc.
$1,337,890.00
2021
August
Construction & Maintenance
Rehabilitation of Structure Nos. E113.00, E113.16, E114.52 and E115.21
Joseph M. Sanzari, Inc.
$42,120,783.50
2021
August
Construction & Maintenance
Superstructure Replacement and Widening of Bridge No. 158.2 GSP Bridge over Passaic River, US Route 46, and River Drive
IEW Construction Group Inc.
$99,956,375.36
2021
August
Construction & Maintenance
Guide Sign Improvements on the New Jersey Turnpike
Creamer Ruberton, A Joint Venture
$13,374,466.60
2021
July
Construction & Maintenance
Bridge Superstructure and Median Barrier Reconstruction Milepost 74.3 to 76.5
Joseph M. Sanzari, Inc.
$25,985,429.90
2021
July
Construction & Maintenance
2021 HVAC Upgrades at Various Locations
ACP Contracting Inc.
$3,955,619.00
2021
July
Construction & Maintenance
Maintenance Storage Buildings
McCauley Construction Co., Inc.
$1,524,999.00
2021
May
Construction & Maintenance
Lighting Improvements at Interchanges 117 & 118 Milepost 118
PKF-Mark III, Inc.
$4,053,063.00
2021
May
Construction & Maintenance
Roadway Resurfacing, MP 0 to 122 (2021)
Stavola Contracting Co., Inc.
$10,189,560.69
2021
April
Construction & Maintenance
Culvert Repairs Milepost 115 to 116
Earle Asphalt Company
$3,302,913.13
2021
April
Construction & Maintenance
Operational Improvements at PNC Bank Arts Center Ramps
Earle Asphalt Company
$7,983,013.13
2021
March
Construction & Maintenance
Lighting Improvements at Interchange 102 & Interchange 105
Daidone Electric, Inc.
$2,268,000.00
2021
March
Construction & Maintenance
Roadway Resurfacing Milepost 83 to 122, Section 19 and 20 (2021)
Crisdel Group, Inc.
$10,062,000.00
2021
March
Construction & Maintenance
Interchange 120 Lighting Improvements
HBC Company Inc.
$2,035,939.50
2021
February
Construction & Maintenance
Roadway Resurfacing, Milepost 83 to 122 Section 16 (2021)
Crisdel Group, Inc.
$8,143,000.00
2021
February
Construction & Maintenance
Underground Storage Tank Removal and Replacement Turnpike Maintenance District 5 Milepost 80.7 SB
Aurora Environmental, Inc.
$767,730.00
2021
February
Construction & Maintenance
Bridge Beam Replacement at Structure Nos. 6.6S and 154.2N
Sparwick Contracting, Inc.
$1,485,735.00
2021
February
Construction & Maintenance
Installation of Hybrid Changeable Message Signs at Various Locations on the New Jersey Turnpike
PKF-Mark III, Inc.
$31,791,713.91
2021
February
Construction & Maintenance
Construction of Concrete Barrier at Maintenance District TMD3 and TMD5
Berto Construction, Inc.
$1,140,288.50
2021
February
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 (2021)
Stavola Contracting Co., Inc.
$18,643,055.51
2021
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2021)
Joseph M. Sanzari, Inc.
$6,974,000.00
2021
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 92, and the Pearl Harbor Memorial Turnpike Extension (2021)
Ferreira Construction Co., Inc.
$8,169,171.00
2020
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2021)
D'Annunzio & Sons, Inc.
$12,117,000.00
2020
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172 (2021)
Joseph M. Sanzari, Inc.
$6,618,255.00
2020
December
Construction & Maintenance
Roadway Lighting Repairs Interchange 14 and Newark Bay-Hudson County Extension Mileposts 103.7 to 105.4, N3.3 to N5.3, N6.0 to N8.2
H.B.C. Company, Inc.
$11,683,220.00
2020
November
Construction & Maintenance
Construction of Pre-Engineered Metal Building at Maintenance District TMD1, MP 13.0
Dandrea Construction Co., Inc.
$2,076,534.14
2020
November
Construction & Maintenance
Culvert Rehabilitation Milepost 111.5
Joseph M. Sanzari, Inc.
$5,670,490.00
2020
September
Construction & Maintenance
Toll Lane Treadle Rehabilitation at Various Toll Plazas on the New Jersey Turnpike and Garden State Parkway
Joseph M. Sanzari, Inc.
$2,195,660.00
2020
August
Construction & Maintenance
Drainage Repairs Milepost 110.6 to 116.4
Green Construction, Inc.
$5,774,000.00
2020
August
Construction & Maintenance
Guide Rail Improvements Milepost 0 to 172
J. Fletcher Creamer & Son, Inc.
$12,447,315.00
2020
July
Construction & Maintenance
Immediate & Scheduled Roofing Repairs
USA General Contractors Corp.
3.85%
2020
July
Construction & Maintenance
2020 HVAC Improvements at Various Locations
ACP Contracting Inc.
$2,949,376.00
2020
July
Construction & Maintenance
Roof Replacement at Turnpike Hightstown Renovated Trades Shops
Pravco, Inc.
$786,196.00
2020
July
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2020)
Stavola Contracting Co., Inc.
$7,090,271.95
2020
July
Construction & Maintenance
Bridge Deck and Median Barrier Reconstruction Milepost 160.6 To 162.5
Conti Enterprises, Inc.
$57,288,442.00
2020
June
Construction & Maintenance
Bridge Deck and Median Barrier Reconstruction Milepost 140 to 143
Joseph M. Sanzari, Inc.
$48,380,000.00
2020
June
Construction & Maintenance
Rehabilitation of Concrete Median Barrier, Milepost 129 to 134
Kyle Conti Construction, LLC
$24,488,888.00
2020
May
Construction & Maintenance
Installation of Hybrid Changeable Message Signs at Various Locations on the New Jersey Turnpike, Milepost 83.30 to 117.60
J. Fletcher Creamer & Son, Inc.,
$42,982,228.00
2020
May
Construction & Maintenance
Roadway Resurfacing, Milepost 83 to 122 Section 19,22 and 23 (2020)
Crisdel Group, Inc
$23,344,000.00
2020
April
Construction & Maintenance
Shoulder Widening of the Garden State Parkway Milepost 30 to 35 Township of Egg Harbor and City of Somers Point, Atlantic County
Midlantic Construction LLC
$82,831,386.38
2020
April
Construction & Maintenance
Lighting Improvements at Interchange 98
Daidone Electric, Inc.
$4,286,000.00
2020
April
Construction & Maintenance
Interchange 14 Concrete Roadway Repairs and Resurfacing
Crisdel Group, Inc.
$9,785,000.00
2020
March
Construction & Maintenance
Rehabilitation of Structure Nos. E106.68 and E106.92B, Milepost E106.0 to E107.0
Joseph M. Sanzari, Inc.
$17,940,145.05
2020
March
Construction & Maintenance
Bridge Deck Reconstruction and Lengthening Structure No. 30.75R
Driscoll Construction Co., Inc.
$17,363,209.35
2020
March
Construction & Maintenance
Roadway Lighting Repairs New Jersey Turnpike Interchanges 2, 3, 4, & Mileposts 12.9, 26.1, 34.5, & 44.4
PKF-Mark III, Inc.
$ 9,170,407.00
2020
March
Construction & Maintenance
Fender System Repairs and Pier E6, E7 and E8 Improvements Str. No. N2.01, Newark Bay Bridge
Mount Construction Co., Inc.
$7,999,667.67
2020
March
Construction & Maintenance
NS95L Non-Vegetative Areas Milepost 120.6 to 121.3
M.L. Ruberton Const. Co., Inc.
$490,659.50
2020
March
Construction & Maintenance
Roadway Resurfacing, Milepost 83 to 122 Section 14 and 17 (2020)
Crisdel Group, Inc.
$27,785,000.00
2020
February
Construction & Maintenance
Immediate & Scheduled Repairs of Facilities
Joseph M. Sanzari, Inc.
3.58%
2020
February
Construction & Maintenance
Turnpike Berm Surfacing Revisions Milepost 48 to 83
Joseph DeFino Trucking Co., Inc. dba DeFino Contracting Company
$6,422,000.00
2020
February
Construction & Maintenance
Roadway Resurfacing, Milepost 0 to 126 (2020)
C.J. Hess, Inc.
$25,494,191.25
2020
February
Construction & Maintenance
Immediate and Scheduled Electrical Repairs
Immediate and Scheduled Electrical Repairs
10.63%
2020
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 92 and the Pearl Harbor Memorial Turnpike Extension (2020)
Ferreira Construction Co., Inc
$10,777,269.00
2020
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2020)
Joseph M. Sanzari, Inc.
$8,969,397.50
2020
January
Construction & Maintenance
Culvert Rehabilitation Milepost 158.1
Sparwick Contracting, Inc.
$1,639,153.00
2020
January
Construction & Maintenance
Interchange 18E Express E-ZPass and 16E Improvements
Joseph M. Sanzari, Inc.
$21,186,840.50
2019
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 92 To 122 and the Newark Bay– Hudson County Extension (2020)
Joseph M. Sanzari, Inc.
$13,984,948.00
2019
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172 (2020)
Joseph M. Sanzari, Inc.
$11,337,000.00
2019
November
Construction & Maintenance
Bridge Deck Reconstruction Structure No. 87.27S Mainline (NSI) over Main Street (CR 531)
Ferreira Construction Co., Inc.
$3,387,269.00
2019
November
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features and Sign Structures on the Garden State Parkway
J. Fletcher Creamer & Son, Inc
$9,651,777.00
2019
November
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features and Sign Structures on the New Jersey Turnpike
J. Fletcher Creamer & Son, Inc
$8,899,777.00
2019
November
Construction & Maintenance
Lighting Improvements at Interchange 114
H.B.C. Company, Inc.
$2,991,830.00
2019
November
Construction & Maintenance
Maintenance and Repair of Traffic Signals on the New Jersey Turnpike and Garden State Parkway
Joseph M. Sanzari, Inc.
$4,113,642.00
2019
October
Construction & Maintenance
Culvert Rehabilitation Milepost 117.4 and 117.85
Joseph M. Sanzari, Inc.
$4,113,642.00
2019
September
Construction & Maintenance
Bridge Fender Repairs and Rehabilitation
George Harms Construction Co., Inc.
$6,658,750.00
2019
September
Construction & Maintenance
Express E-ZPass Improvements at Interchange 6 Toll Plaza Milepost P1.2 to P4.7
Earle Asphalt Company
$7,131,513.13
2019
August
Construction & Maintenance
Maintenance and Repair of the Roadway Lighting System along the New Jersey Turnpike and Garden State Parkway
Daidone Electric
$3,640,000.00
2019
August
Construction & Maintenance
Line Striping Installation and Maintenance on the New Jersey Turnpike and Garden State Parkway
Traffic Lines, Inc.
$8,139,500.00
2019
August
Construction & Maintenance
Immediate and Scheduled Repairs (2019) Milepost 0 to 122 New Jersey Turnpike and Milepost 0 to 172 Garden State Parkway
Mount Construction Co., Inc.
0.91%
2019
July
Construction & Maintenance
Maintenance and Repair of Storm Water Drainage Systems
Joseph M. Sanzari, Inc.
$5,498,750.00
2019
June
Construction & Maintenance
On Call HVAC Controls Repairs
A.M.E., Inc.
2.50%
2019
May
Construction & Maintenance
Immediate and Scheduled Repairs of Drainage Structures and Underground Facilities
Mount Construction Co.
1.73%
2019
May
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 83 (2019)
Crisdel Group, Inc.
$5,441,770.00
2019
May
Construction & Maintenance
Jersey Avenue Bridge over Mill Creek
Union Paving & Construction Co., Inc.
$9,432,453.47
2019
April
Construction & Maintenance
Installation of Variable Message Signs at New and Existing Locations on the New Jersey Turnpike and Garden State Parkway Turnpike MP 0.20 to E113.69, Parkway MP 11.96 to 143.70
PFK- Mark III, Inc.
$17,865,277.28
2019
April
Construction & Maintenance
Rehabilitation of Print Shop at Telegraph Hill
Santorini Construction Inc.
$2,370,000.00
2019
April
Construction & Maintenance
Roadway Resurfacing Milepost 83 to 122 (2019)
Crisdel Group. Inc.
$16,762,712.00
2019
April
Construction & Maintenance
Immediate and Scheduled Asphalt Repairs
Crisdel Group. Inc.
11.83%
2019
April
Construction & Maintenance
Immediate and Scheduled Roadway and Structure Repairs
Joseph M. Sanzari, Inc.
4.4%
2019
March
Construction & Maintenance
Roadway Resurfacing and Interchange 11 Ramp TNO Improvements Milepost 83 to 122 (2019)
Stavola Contraction Co., Inc.
$17,659,156.15
2019
March
Construction & Maintenance
Roadway Weather Information Systems Stations
Daidone Electric, Inc.
$2,454,000.00
2019
March
Construction & Maintenance
Replacement of Service Areas 6-S & 6-N Water Supply System
South State, Inc.
$1,059,546.00
2019
February
Construction & Maintenance
T100.436 Rehabilitation of New Jersey Turnpike Passaic River Bridges Structure Nos. W107.87 and E107.88
Cornell & Company, Inc.
$27,986,153.00
2019
February
Construction & Maintenance
2019 HVAC Upgrades at Various Locations
ACP Contracting Inc.
$2,589,339.00
2019
February
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 92 and the Pearl Harbor Memorial Turnpike Extension (2019)
Ferreira Construction Co.
$8,496,269.00
2019
February
Construction & Maintenance
Guide Sign and Guide Rail Improvements NJ Turnpike Milepost 20.9-120.7, PHMTE Milepost 4.6 Garden State Parkway Milepost 129.7-131.9
J. Fletcher Creamer & Son
$2,689,744.00
2019
February
Construction & Maintenance
Construction of Two Pre-Engineered Metal Buildings at PMD5, Telegraph Hill, Milepost 116
Shorelands Construction
$2,580,268.65
2019
February
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126 (2019)
Joseph M. Sanzari, Inc.
$7,196,473.50
2019
February
Construction & Maintenance
Molly Pitcher Service Area (7S) Replacement Sanitary Pump Station Milepost 71.7
Mount Construction Co., Inc.
$1,031,545.00
2019
January
Construction & Maintenance
Bridge Deck Reconstruction and Misc. Structural Improvements Structure Nos. N0.28A, N0.75, N2.01W, N2.01 and N2.01E, Milepost N0.00 to N6.00
Schiavone Construction Co. LLC
$138,828,000.00
2018
December
Construction & Maintenance
Express E-ZPass Improvements at New Gretna Toll Plaza Milepost 51.5 to 53.9
South State, Inc.
$6,433,239.00
2018
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2019)
Joseph M. Sanzari, Inc.
$11,239,000.00
2018
December
Construction & Maintenance
PNC Bank Arts Center Improvements
TN Ward
$21,527,500.00
2018
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172 (2019)
Joseph M. Sanzari, Inc.
$9,315,876.00
2018
December
Construction & Maintenance
Construction of Salt Shed at TMD6
Dobco Inc.
$3,707,251.50
2018
October
Construction & Maintenance
Turnpike Interchange 11 Replacement of North Ramp Gates
Union Paving & Construction Co., Inc.
$3,471,827.35
2018
September
Construction & Maintenance
Construction of HVAC Improvements to Amphitheatre at the PNC Bank Arts Center
Joseph M. Sanzari, Inc.
$1,045,900.00
2018
August
Construction & Maintenance
Immediate and Scheduled Electrical Repairs
Daidone Electric
10.83%
2018
August
Construction & Maintenance
Interchange 14B Toll Plaza Canopy Replacement
J. Fletcher Creamer & Son, Inc.
$1,983,333.00
2018
August
Construction & Maintenance
Turnpike Interchanges 14B and 15E Generator Replacement
H.B.C. Company, Inc.
$1,952,598.25
2018
August
Construction & Maintenance
Turnpike Interchange 13A Generator Replacement
H.B.C. Company, Inc.
$545,490.00
2018
August
Construction & Maintenance
Immediate and Scheduled Repairs of Mechanical Systems
ACP Contracting Inc.
6.7%
2018
August
Construction & Maintenance
Interchange 142 Union Ramp Toll Plaza Booth Replacement
Joseph M. Sanzari, Inc.
$3,434,798.00
2018
August
Construction & Maintenance
Culvert Cleaning Milepost 111.5
Mount Construction Co., Inc.
$1,347,631.00
2018
July
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 172 (2018)
Crisdel Group, Inc.
$17,777,000.00
2018
July
Construction & Maintenance
Int. 109 Improvements Milepost 109.8 to 110.4
Earle Asphalt Company
$10,897,313.13
2018
July
Construction & Maintenance
Replacement of Wastewater Pumping Stations at the Atlantic City and Monmouth Service Areas
C. Abbonizio Contractors, Inc.
$1,220,096.00
2018
June
Construction & Maintenance
UST Removal and Replacement Milepost 13.0 to 67.7 Parkway Maintenance District 1, 2, and 3
Aurora Environmental, Inc.
$1,625,492.00
2018
June
Construction & Maintenance
Pier Reconstruction, Structure No. W115.36 Ridgefield Borough, Bergen County, NJ
Joseph M. Sanzari, Inc.
$9,874,996.25
2018
June
Construction & Maintenance
Interchange 117 Toll Utility Building Rehabilitation
Shorelands Construction Inc.
$1,451,300.90
2018
April
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2018)
Stavola Contracting Co., Inc.
$8,817,293.75
2018
April
Construction & Maintenance
2018 HVAC Upgrades at Various Locations New Jersey Turnpike Interchanges 2, 4, 8A, 14C, 15E and 17
ACP Contracting Inc.
$1,837,759.00
2018
March
Construction & Maintenance
Rehabilitation of Concrete Median Barrier, Milepost 80 to 84
Rencor, Inc.
$6,846,778.50
2018
March
Construction & Maintenance
Replacement of the Central Avenue Overpass at Interchange 145 and Bridge Deck Reconstruction, Mileposts 144 to 152
George Harms Construction Co., Inc.
$63,186,106.75
2018
March
Construction & Maintenance
Roof Replacement at Turnpike Cranbury State Police Barracks
Pravco, Inc.
$415,180.00
2018
March
Construction & Maintenance
Roof Replacement at Turnpike Maintenance District 10
D.A. Nolt, Inc.
$412,806.00
2018
March
Construction & Maintenance
Maintenance and Repairs of Traffic Signals on the New Jersey Turnpike and Garden State Parkway
Jen Electric, Inc.
$267,585.00
2018
February
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 (2018)
A. E. Stone, Inc.
$15,938,000.00
2018
February
Construction & Maintenance
Rehabilitation of Concrete Median Barrier Milepost 0 to 122
South State, Inc.
$3,896,279.70
2018
January
Construction & Maintenance
Bridge Deck Repairs and Resurfacing Milepost 83 to 122 and the Newark Bay-Hudson County Extension (2018)
Joseph M. Sanzari, Inc.
$11,988,009.00
2018
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 122, the Newark Bay–Hudson County Extension (NB-HCE) and the Pearl Harbor Memorial Turnpike Extension (PHMTE)(2018)
Ferreira Construction Co. Inc.
$8,852,000.00
2018
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 126 (2018)
Ferreira Construction Co. Inc.
$5,856,294.50
2018
January
Construction & Maintenance
Turnpike Interchanges 3 and 4 Toll Island and Pavement Repairs
South State, Inc.
$1,343,205.00
2018
January
Construction & Maintenance
Roadway Resurfacing Milepost 83 to 122 (2018)
Crisdel Group
$24,154,000.00
2018
January
Construction & Maintenance
Construction of Parking Lot Lighting Improvements at the PNC Bank Arts Center Lots 3 and 4
Solar-Mite Electrical Contractors, Inc.
$1,787,718.10
2017
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172 (2018)
Joseph M. Sanzari, Inc.
$7,595,500.00
2017
September
Construction & Maintenance
Canopy Strengthening and Sign Installation – New Jersey Turnpike Toll Plazas
M.L. Ruberton Const. Co
$3,156,600.00
2017
September
Construction & Maintenance
Noise Barrier and Miscellaneous Repairs MP 70 to 100
Sparwick Contracting, Inc.
$957,795.00
2017
August
Construction & Maintenance
Immediate Repair of Drainage Structures and Underground Facilities
Mount Construction Co., Inc.
3.83%
2017
July
Construction & Maintenance
Maintenance and Repair of the Roadway Lighting System along the New Jersey Turnpike and Garden State Parkway
Daidone Electric, Inc.
$4,768,000.00
2017
June
Construction & Maintenance
Immediate Repair of Facilities
USA General Contractors Corp.
9%
2017
June
Construction & Maintenance
Line Striping Installation and Maintenance on the New Jersey Turnpike and Garden State Parkway
Traffic Lines, Inc.
$3,268,000.00
2017
June
Construction & Maintenance
Turnpike Interchanges 11 and 16E Generator Replacement
FAI-GON Electric, Inc.
$1,523,995.00
2017
June
Construction & Maintenance
Turnpike Interchanges 3 and 5 Generator Replacement
Diehl Electric, Inc.
$826,500.00
2017
June
Construction & Maintenance
2017 HVAC Upgrades at Various Locations New Jersey Turnpike Interchanges 13, 14B, 15W, 16W, 16E/18E and TMD 2 Maintenance Building
ACP Contracting Inc.
$1,941,364.00
2017
May
Construction & Maintenance
Roof Replacement at Turnpike Cranbury State Police Garage
Northeast Roof Maintenance, Inc.
$237,000.00
2017
May
Construction & Maintenance
Roof Replacement at Turnpike Interchange 14C Toll Canopy
MTB LLC
$238,000.00
2017
May
Construction & Maintenance
Rehabilitation of Structure Nos. N6.49; N6.80E and N6.80W Milepost N5.80 to N8.20
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture
$88,875,642.80
2017
April
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features And Sign Structures on the Garden State Parkway
J. Fletcher Creamer & Son, Inc.
$6,641,444.00
2017
April
Construction & Maintenance
Maintenance and Repair of Roadside Safety Features And Sign Structures on the New Jersey Turnpike
J. Fletcher Creamer & Son, Inc.
$6,827,666.00
2017
March
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 84 (2017)
Stavola Contracting Co., Inc.
$18,249,000.00
2017
March
Construction & Maintenance
Construction of Parking Lot Lighting Improvements at the PNC Bank Arts Center
H.B.C. Company, Inc.
$2,228,390.70
2017
March
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 122 (2017)
Crisdel Group, Inc.
$6,286,668.00
2017
March
Construction & Maintenance
Roadway Resurfacing Milepost 0 to 126 (2017)
Earle Asphalt Co.
$11,492,113.13
2017
February
Construction & Maintenance
Immediate Roofing Repairs New Jersey Turnpike Milepost 88.3 to Milepost 122.0 and Garden State Parkway Milepost 110.0 to Milepost 172.0
USA General Contractors Corp.
4.00%
2017
February
Construction & Maintenance
Immediate Roofing Repairs New Jersey Turnpike Milepost 0.0 to Milepost 83.4 and Garden State Parkway Milepost 0.0 to Milepost 107.0
USA General Contractors Corp.
4.00%
2017
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126
Joseph M. Sanzari, Inc.
$7,782,762.00
2017
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 122, the Newark Bay - Hudson County Extension and the Pearl Harbor Memorial Turnpike Extension
Joseph M. Sanzari, Inc.
$8,985,318.50
2016
December
Construction & Maintenance
Stormwater Collection System Cleaning and Inspection, Milepost 63 to 80, Ocean County
North American Pipeline Services LLC
$416,450.00
2016
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172
Ferreira Construction Co. Inc.
$7,787,000.00
2016
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and the Newark Bay-Hudson County Extension
Joseph M. Sanzari, Inc.
$7,998,085.00
2016
December
Construction & Maintenance
Interchange 38 Atlantic City Expressway Bridge 20WB Widening and Rehabilitation
South State, Inc.
$6,439,441.62
2016
October
Construction & Maintenance
Culvert Rehabilitation, Milepost 123.8, Middlesex County
Rencor, Inc., Somerville, NJ
$4,375,565.40
2016
August
Construction & Maintenance
Immediate and Scheduled Repairs, Milepost 0 to 122 New Jersey Turnpike and Milepost 0 to 172 Garden State Parkway
Joseph M. Sanzari, Inc., Hackensack, NJ
4.84%
2016
July
Construction & Maintenance
Rehabilitation of Structure Nos. 28.0N, 28.5N, and 28.9 and Demolition of Structure Nos. 28.0S and 28.5S
Richard E. Pierson Construction Co., Inc., Pilesgrove, NJ
$49,768,162.13
2016
May
Construction & Maintenance
Roof Replacement at Turnpike Interchange 16/18E Toll Canopy
USA General Contractors Corp. Elizabeth, NJ
$552,000.00
2016
May
Construction & Maintenance
On Call HVAC Controls Repair on New Jersey Turnpike MP 0 to 122 and Garden State Parkway MP 0 to 172
A.M.E. Inc., Fairfield, NJ
$1,000,000.00
2016
May
Construction & Maintenance
Shoulder and Ramp Bridge Deck Reconstruction and Miscellaneous Improvements, Milepost N0.00 to N6.00
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture - Hackensack, NJ
$55,726,255.34
2016
May
Construction & Maintenance
2016 HVAC Upgrades at Various Locations
WHL Enterprises, Inc., Metuchen, NJ
$1,708,300.00
2016
April
Construction & Maintenance
Placement of Pervious Pavement Within Grassed Median Areas from Milepost 112.2 to 123.5 Along the Garden State Parkway
Earle Asphalt Company, Farmingdale, NJ
$589,413.13
2016
April
Construction & Maintenance
Interchange 125 Improvements, Milepost 125.7 to 128.1
A. Servidone, Inc. & B. Anthony Construction Corp., A Joint Venture, Old Bridge, NJ
$72,391,523.50
2016
March
Construction & Maintenance
Central Pavement Restoration and Miscellaneous Improvements (2016), Milepost 80 to 143
Earle Asphalt Company, Farmingdale, NJ
$8,991,313.13
2016
March
Construction & Maintenance
Immediate & Scheduled Repairs of Mechanical Systems on New Jersey Turnpike MP 0 to 122 and Garden State Parkway MP 0 to 172
Gaudelli Bros., Inc. Millville, NJ
9.20%
2016
March
Construction & Maintenance
Maintenance and Repair of Storm Water and Sanitary Systems
Mount Construction Co., Inc., Berlin, NJ
$5,147,250.00
2016
March
Construction & Maintenance
Immediate and Scheduled Roadway and Structure Repairs on the New Jersey Turnpike MP 0 to 122 and Garden State Parkway MP 0 to 172
Joseph M. Sanzari, Inc., Hackensack, NJ
4.35%
2016
February
Construction & Maintenance
HVAC Upgrades to New Jersey Turnpike Interchanges 13A & 14 and Services Areas Thomas Edison 10S and Alexander Hamilton 12S
ACP Contracting Inc. Fairfield, NJ
$2,176,000.00
2016
February
Construction & Maintenance
Resurfacing, Milepost 83 to 122 (2016)
Stavola Contracting Co., Inc. Red Bank, NJ
$7,168,000.00
2016
February
Construction & Maintenance
Roof Replacement at Turnpike Vince Lombardi Service Area
Integrity Roofing, Inc. Rahway, NJ
$265,340.00
2016
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 122, the Newark Bay-Hudson County Extension (NB-HCE) and the Pearl Harbor Memorial Turnpike Extension (PHMTE)
Halmar International LLC Nanuet, NY
$7,384,918.50
2016
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 126 to 172
Ferreira Construction Co., Inc. Branchburg, NJ
$4,917,558.92
2016
January
Construction & Maintenance
Resurfacing Milepost 0 to 83 and PHMTE
Crisdel Group, Inc. South Plainfield, NJ
$6,287,740.00
2015
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and the Newark Bay Hudson County Extension (NBHCE)
Joseph M. Sanzari, Inc. Hackensack, NJ
$8,674,515.00
2015
December
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 126
Joseph M. Sanzari, Inc. Hackensack, NJ
$5,139,445.00
2015
December
Construction & Maintenance
Facilities Improvements to Interchange 1, MP 2.4 NB, Maintenance Districts TMD 2 MP 37.0 NB, and TMD 3 MP 56.0 NB
Dobco, Inc. Wayne, NJ
$56,893,382.00
2015
December
Construction & Maintenance
Salt Storage Shed at Montvale Service Area
Alna Construction Corp. Secaucus, NJ
$3,999,000.00
2015
November
Construction & Maintenance
Maintenance and Repair of Traffic Signals on the New Jersey Turnpike and Garden State Parkway
Jen Electric, Inc. Springfield, NJ
$330,664.00
2015
November
Construction & Maintenance
New Multi-use Building and Salt Storage Shed at Parkway Maintenance District 2 Whitehorse & Parkway Maintenance District 3 Ocean
A.P. Construction, Inc. Blackwood, NJ
$40,838,672.38
2015
September
Construction & Maintenance
Construction NJSP Troop D Newark Station and Associated Sitework
Benjamin R. Harvey Co., Inc. Ocean, NJ
$20,944,000.00
2015
September
Construction & Maintenance
Maintenance and Repair of the Roadway Lighting System Along The New Jersey Turnpike and Garden State Parkway
Daidone Electric Newark, NJ
$3,390,000.00
2015
August
Construction & Maintenance
Improvements to Interchange 105 Wayside Road Connection Tinton Falls Borough Monmouth County
Earle Asphalt Company Farmingdale, NJ
$20,103,413.13
2015
August
Construction & Maintenance
Interchange 0 Improvements Grading, Paving and Drainage Milepost 0.0, Township Of Lower Cape May County
South State, Inc. Bridgeton, NJ
$7,439,842.50
2015
August
Construction & Maintenance
Placement of Pervious Pavement within Grassed Median Areas along the Garden State Parkway
Joseph DeFino Trucking Co., Inc. /dba DeFino Contracting Company Cliffwood Beach, NJ
$923,000.00
2015
July
Construction & Maintenance
Facilities Improvement Program – Turnpike North Turnpike Maintenance District 4 Central Shops/Hightstown – Milepost 67S East Windsor Township, County Of Mercer, NJ Turnpike Maintenance District 9 Jersey City – Milepost 5.9 NBHCE City Of Jersey City, County Of Hudson, NJ
Joseph A. Natoli Pine Brook, NJ
$41,087,000.00
2015
July
Construction & Maintenance
Facilities Improvement Program PMD5 (Telegraph Hill) MP 116, PMD6 (Clark) MP 136.7 PMD7 (Clifton) MP 156.1 and PMD8 (Paramus) MP 164.2
Dobco Inc. Wayne, NJ
$51,999,999.81
2015
June
Construction & Maintenance
Immediate and Scheduled Repair of Drainage Structures and Underground Facilities
Joseph M. Sanzari, Inc. Hackensack, NJ
3.88%
2015
May
Construction & Maintenance
Immediate Repair of Facilities
Hall Building Corp. Farmingdale, NJ
12.66%
2015
May
Construction & Maintenance
Facilities Improvements to Maintenance District TMD5 - Milltown Milepost 81.0 SB
Patock Construction Company Tinton Falls, NJ
$14,270,104.00
2015
April
Construction & Maintenance
Cental Pavement Restoration and Miscellaneous Improvements (2015) Milepost 80 to 143
Crisdel Group, Inc. South Plainfield, NJ
$9,475,000.00
2015
April
Construction & Maintenance
Roadwide Guide Sign Improvements on the New Jersey Turnpike
PKF-Mark III Inc. Newton, PA
$26,978,815.80
2015
April
Construction & Maintenance
Construction of New Central Inventory Building Milepost 90.0 NB
George Harms Construction Co., Inc. Farmingdale, NJ
$33,715,547.40
2015
March
Construction & Maintenance
Construction of Motor Vehicle Facility At Bloomfield NJSP Station Milepost 153.0 NB
Joseph A. Natoli Construction Corp., Pine Brook, NJ
$7,237,000.00
2015
March
Construction & Maintenance
Roof Replacement at Parkway Montvale Service Area
Pravco, Inc. Rahway, NJ
$529,900.00
2015
March
Construction & Maintenance
2015 HVAC Equipment Upgrades
Gaudelli Bros. Inc. Millville, NJ
$1,274,200.00
2015
March
Construction & Maintenance
Resurfacing Milepost 0 to Milepost 83 and PHMTE
Crisdel Group, Inc., South Plainfield, NJ
$6,455,000.00
2015
February
Construction & Maintenance
Immediate Roofing Repairs New Jersey Turnpike Milepost 88.3 to Milepost 122.0 and Garden State Parkway Milepost 110.0 to Milepost 172.0
USA General Contractors Corp. Elizabeth, NJ
7.00%
2015
February
Construction & Maintenance
Resurfacing Milepost 83 to Milepost 122
Crisdel Group, Inc. South Plainfield, NJ
$7,676,000.00
2015
February
Construction & Maintenance
Facilities Improvement Program – Turnpike North Turnpike Maintenance District 6 (TMD-6) Elizabeth – Milepost 101N
A.P.S. Contracting Inc. Paterson, NJ
$14,923,020.00
2015
February
Construction & Maintenance
Roof Replacement at Clara Barton Service Area
MTB LLC Neptune City, NJ
$368,000.00
2015
February
Construction & Maintenance
Roof Replacement at John Fenwick Service Area
MTB LLC Neptune City, NJ
$398,000.00
2015
February
Construction & Maintenance
Toll Plaza Boiler Replacements Interchanges 7A, 8A, 11, 17, 18W and Pascack Valley
WHL Enterprises, Inc. T/A Bill Leary A/C & Heating Metuchen, NJ
$1,522,900.00
2015
February
Construction & Maintenance
Immediate Roofing Repairs New Jersey Turnpike Milepost 0.0 to Milepost 83.4 and Garden State Parkway Milepost 110.0 to Milepost 172.0
USA General Contractors Corp. Elizabeth, NJ
7.00%
2015
January
Construction & Maintenance
Facilities Improvements to Maintenance District TMD1 - Swedesboro Milepost 13.0 NB
A. P. Construction, Inc. Blackwood, NJ
$12,369,947.00
2015
January
Construction & Maintenance
Bridge Repairs and Resurfacing, Milepost 0 to 122, Newark Bay–Hudson County Extension and the Pearl Harbor Memorial Turnpike Extension
Joseph M. Sanzari, Inc. Hackensack, NJ
$8,424,454.50
2015
January
Construction & Maintenance
Storage Building at Parkway District 5
Shorelands Construction Inc. Monmouth Beach, NJ
$881,281.12
2015
January
Construction & Maintenance
Statewide Traffic Management Center Floor Plan Renovations
Timothy P. Bryan Electric Co. Inc. Trenton, NJ
$869,387.33
2015
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 126
Joseph M. Sanzari, Inc. Hackensack, NJ
$8,132,437.00
2015
January
Construction & Maintenance
Facilities Improvement Program PMD 1 – Swainton – Milepost 13.8, Township Of Middle, Cape May County and PMD 4 – Herbertsville – Milepost 94.3, and PMD 4 – Herbertsville – Milepost 94.3,
A. P. Construction, Inc. Blackwood, NJ
$31,918,222.50
2014
December
Construction & Maintenance
Construction of Salt Shed at New Jersey Turnpike Pennsylvania Extension Milepost 2.4W
Hall Building Corp. Farmingdale, NJ
$5,273,757.00
2014
December
Construction & Maintenance
Salt Shed at Union Ave. Parkway Milepost 143.0
Hall Building Corp. Farmingdale, NJ
$4,307,052.00
2014
December
Construction & Maintenance
Bridge Deck Reconstruction, Milepost 121 to 131 Monmouth and Middlesex Counties, New Jersey
Northeast Remsco Construction Farmingdale, NJ
$40,537,044.20
2014
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and the Newark Bay-Hudson County Extension
Joseph M. Sanzari, Inc. Hackensack, NJ
$10,998,775.50
2014
December
Construction & Maintenance
Guide Rail and Impact Attenuator Maintenance and Repair on the Garden State Parkway from MP 0 To 172.3
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
$5,833,091.00
2014
December
Construction & Maintenance
Guide Rail and Impact Attenuator Maintenance and Repair New Jersey Turnpike from MP 0 to MP 122 Including the Pearl Harbor Memorial and Newark Bay Extensions
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
$6,584,956.00
2014
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172
Ferreira Construction Co., Inc. Branchburg, NJ
$7,472,568.50
2014
November
Construction & Maintenance
Guide Sign Improvements on the Garden State Parkway Milepost 0 to 32 & Milepost 98 to 128
PKF Mark III Newtown, PA
$22,474,470.65
2014
November
Construction & Maintenance
Improvements at Interchanges 15W & 16W Milepost 108.7 to Milepost 112.8
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture Hackensack, NJ
$12,636,318.60
2014
November
Construction & Maintenance
Bridge Deck Reconstruction, Milepost 143 to 159 Hillside, Irvington, Bloomfield, Clifton and Elmwood Park Union, Essex, Passaic and Bergen Counties, New Jersey
Ferreira Construction Co., Inc. Branchburg, NJ
$45,279,000.00
2014
November
Construction & Maintenance
Interchange 14A Toll Plaza & Ramps Grading, Drainage, Paving, Structures & Lighting Milepost N0.0 to N4.0 Cities of Bayonne and Jersey City, Hudson County
Union Paving & Construction Co., Inc. Mountainside, NJ
$159,931,514.89
2014
October
Construction & Maintenance
Interchange 36 to 48 Widening Milepost 34.5 to Milepost 38 and Interchange Improvements
Pierson-South State II A Joint Venture. Bridgeton, NJ
$84,088,096.13
2014
August
Construction & Maintenance
Guide Sign Improvements on the Garden State Parkway Milepost 143 to 172
PKF Mark III Newtown, PA
$23,299,229.27
2014
August
Construction & Maintenance
Operational Improvements at Alexander Hamilton Service Area
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture Hackensack, NJ
$3,891,949.88
2014
July
Construction & Maintenance
Beaverdam Brook Culvert Maintenance Path and Embankment Stabilization Milepost 79.40 to 79.50
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
$451,771.00
2014
July
Construction & Maintenance
Garden State Parkway Interchange 36 to 48 Widening Milepost 38.0 to Milepost 41.0
Midlantic Construction LLC Barnegat, NJ
$41,361,717.27
2014
July
Construction & Maintenance
Line Striping Maintenance and Installation on the New Jersey Turnpike and Garden State Parkway
Traffic Lines, Inc Farmingdale, NJ
$4,578,000.00
2014
June
Construction & Maintenance
PNC Bank Arts Center Parking Lot 10 Lighting and Accessibility Improvements
Joseph M. Sanzari, Inc. Hackensack, NJ
$1,131,390.00
2014
June
Construction & Maintenance
Repainting of Structural Steel, Seismic Retrofit, Catwalk, Lighting, and Miscellaneous Improvements to the Delaware River Turnpike Bridge, Structure No. P0.00 Burlington Township, Burlington County, New Jersey Bristol Township, Bucks County, Pennsylvania
Allied Painting, Inc. Cherry Hill, NJ
$50,510,289.50
2014
June
Construction & Maintenance
Repainting Structural Steel and Miscellaneous Bridge Improvements Milepost 104 to 161 Monmouth, Middlesex, Union, Essex, Passaic, and Bergen Counties, New Jersey
Allied Painting, Inc. Cherry Hill, NJ
$10,977,062.00
2014
June
Construction & Maintenance
Garden State Parkway Interchange 36 to 48 Widening MP 42.3 to MP 48
South State, Inc. Bridgeton, NJ
$36,179,132.76
2014
May
Construction & Maintenance
Immediate Repair of Drainage Structures and Underground Repairs
Joseph M. Sanzari, Inc. Hackensack, NJ
4.83%
2014
May
Construction & Maintenance
Construction of Troop D Newark Station Milepost 104.7 SB Essex County, New Jersey
Intercontinental Construction Contracting . Passaic, NJ
$19,751,680.00
2014
April
Construction & Maintenance
ETC Phase III UPS Upgrades Project Interchanges 1, 6, 6A, 11, 13, 13A, 14, 15X and 16/18E
PKF Mark III Newtown, PA
$822,882.00
2014
April
Construction & Maintenance
Interchange 163 Improvements Milepost 162.2 to 163.9 Borough of Paramus Bergen County
Ferreira Construction Co., Inc. Branchburg, NJ
$67,923,080.00
2014
April
Construction & Maintenance
2014 HVAC Equipment Upgrades
Jersey Mechanical Contractors, Inc. Farmingdale, NJ
$1,061,800.00
2014
April
Construction & Maintenance
Resurfacing Milepost 0 to 48 and Pearl Harbor Memorial Turnpike Extension
Crisdel Group, Inc., South Plainfield, NJ
$4,251,000.00
2014
March
Construction & Maintenance
Central Pavement Restoration and Miscellanous Improvements Milepost 80 to 143
Stavola Contracting Co., Inc. Tinton Falls, NJ
$7,716,269.00
2014
March
Construction & Maintenance
Barrier Free Improvements at Various Service Areas
IEW Construction Group Inc. Trenton, NJ
$736,495.27
2014
March
Construction & Maintenance
Barrier Free Improvements at Vaux Hall and Brookdale South Service Areas
John O’Hara Co., Inc. East Orange, NJ
$685,994.01
2014
March
Construction & Maintenance
Roof Replacement at Joyce Kilmer Service Area
USA General Contractors Corp Elizabeth, NJ
$433,800.00
2014
February
Construction & Maintenance
Resurfacing Milepost 74 to Milepost 122
Crisdel Group, Inc. South Plainfield, NJ
$9,677,000.00
2014
February
Construction & Maintenance
Roof Replacement at Bergen and Essex Toll Utility Buildings
MBT LLC Neptune City, NJ
$45,850.00
2014
February
Construction & Maintenance
Reconstruction of Interchange 105 at Hope Road and NJ Route 36 Tinton Falls and Eatontown Boroughs Monmouth County
C. J. Hesse, Inc. Atlantic Highlands, NJ
$9,972,628.07
2014
January
Construction & Maintenance
Bridge Repairs and Resurfacinge Milepost 0 to 126 Cape May, Atlantic, Burlington, Ocean, Monmouth and Middlesex Counties, New Jersey
Joseph M. Sanzari, Inc. Hackensack, NJ
$5,764,320.00
2014
January
Construction & Maintenance
Interchange 6 to 9 Widening Program NSI and SNI Roadway Rehabilitation Paving, Barrier, Bridge Repair and Reforestation Milepost 47.4 to 61.0 Burlington and Mercer Counties
Crisdel Group, Inc. South Plainfield, NJ
$32,494,996.00
2014
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 122 The Newark Bay-Hudson County Extension and The Pearl Harbor Memorial Turnpike Extension Salem, Gloucester, Camden, Burlington, Mercer, Middlesex, Union, Essex, Hudson and Bergen Counties New Jersey
Joseph M. Sanzari, Inc. Hackensack, NJ
$9,115,056.00
2014
January
Construction & Maintenance
Interchange 6 to 9 Widening Program NSI and SNI Roadway Rehabilitation Paving, Barrier, Bridge Repair & Reforestation Milepost 61.0 to 82.4 Mercer and Middlesex Counties
PKF-Mark III Newton, PA
$26,389,946.86
2013
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172
Ferreira Construction Co., Inc. Branchburg, NJ
$6,153,127.50
2013
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing Milepost 83 to 122 and The Newark Bay-Hudson County Extension
D'Annunzio & Sons, Inc. Clark, NJ
$11,707,000.00
2013
October
Construction & Maintenance
Rehabilitation of Toll Utility Buildings - North Interchanges 14B, 14C, 15E, 15W, 16E-18E, 16W, 17 & 18W
Hall Building Corp. Farmingdale, NJ
$5,943,173.00
2013
October
Construction & Maintenance
Miscellaneous Repairs Milepost 109.0 to 123.0 Monmouth and Middlesex Counties
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture Hackensack, NJ
$8,768,862.00
2013
September
Construction & Maintenance
Immediate and Scheduled Repairs Milepost 0 to 122 New Jersey Turnpike and Milepost 0 to 172 Garden State Parkway
Joseph M. Sanzari, Inc. Hackensack, NJ
5.45%
2013
September
Construction & Maintenance
Salt Shed at Turnpike Milepost 117.2N Ridgefield Park Village Bergen County
Alna Construction Corp Secaucus, NJ
$5,349,000.00
2013
August
Construction & Maintenance
Replacement of Maintenance Building at Turnpike District 6 Yard, Milepost E111.5 Town of Secaucus, Hudson County, New Jersey
A.P.S. Contracting, Inc. Paterson, NJ
$12,808,808.00
2013
July
Construction & Maintenance
Repainting Structural Steel and Miscellaneous Bridge Improvements on the New Jersey Turnpike
Anka Painting Company, Inc Palisades Park, NJ
$9,105,000.00
2013
July
Construction & Maintenance
Safety Improvements at Traversable Medians along the New Jersey Turnpike and Garden State Parkway Pearl Harbor Memorial Turnpike Extension Milepost P0.91 to P5.50 Garden State Parkway NB Milepost 6.54 to 168.36
Griffin Sign, Inc. Cinnaminson, NJ
$2,672,135.00
2013
July
Construction & Maintenance
Improvements to Interchange 10 Bridge Widening & Pavement Reconstruction Molepost 88.10 Edison Township, Middlesex County
PKF-Mark III, Inc Newtown, PA
$12,114,928.45
2013
June
Construction & Maintenance
Rehabilitation of Toll Utility Buildings - Central Interchanges 8A, 9, 10, 11, 13, 13A, and 14
Hall Building Corp. Farmingdale, NJ
$6,714,950.00
2013
June
Construction & Maintenance
Storage Building at Garden State Parkway Maintenance District No. 3
Hall Building Corp. Farmingdale, NJ
$1,016,138.00
2013
June
Construction & Maintenance
Storage Building at Garden State Parkway Maintenance District No. 7
JPC Group, Inc. Blackwood, NJ
$1,087,304.98
2013
June
Construction & Maintenance
Interchange 41 and 44 Improvements Milepost 41.0 to 42.3 and 43.8 to 44.3 Galloway Township, Atlantic County
South State, Inc. Bridgeton, NJ
$32,536,509.75
2013
May
Construction & Maintenance
Roof Replacement at Turnpike Interchange 11 Toll Canopy Milepost 90.6 Middlesex County
D. A. Nolt, Inc. Berlin, NJ
$133,428.00
2013
May
Construction & Maintenance
Roof Replacement at Central Shops Garage Milepost 67.6 Mercer County
Pravco, Inc. Rahway, NJ
$176,000.00
2013
May
Construction & Maintenance
Central Pavement Restoration and Miscellaneous Improvements Milepost 80 to 143
Stavola Contracting Co., Inc Tinton Falls, NJ
$8,754,300.00
2013
May
Construction & Maintenance
Garden State Parkway MP 35 to 48 Stormwater Collection System Cleaning and Inspection
Mount Construction Co., Inc Berlin, NJ
$766,147.00
2013
April
Construction & Maintenance
Rehabilitation of Toll Utility Buildings - South Interchanges 2, 3, 4, 5, 6, 6A, 7, & 7A
A. P. Construction, Inc. Blackwood, NJ
$2,817,719.00
2013
April
Construction & Maintenance
Drainage Repairs (2013) Mileposts 117 to 122
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture Hackensack, NJ
$12,863,171.00
2013
April
Construction & Maintenance
Immediate Repairs of Facilities
Hall Building Corporation Farmingdale, NJ
9.83%
2013
April
Construction & Maintenance
Immediate Repair of Drainage Structures and Underground Repairs
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
5.13%
2013
March
Construction & Maintenance
Replacement of Structure Nos. 28.0S and 28.5S, Milepost 27.0 to 28.8
Route 52 Constructors York, PA
$129, 885,762.06
2013
March
Construction & Maintenance
Resurfacing, Milepost 0 to 74
Richard E. Pierson Construction Co., Inc Pilesgrove, NJ
$4,898,608.00
2013
March
Construction & Maintenance
Guide Sign Improvements on the New Jersey Turnpike and Garden State Parkway
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
$21,674,244.00
2013
February
Construction & Maintenance
Roof Replacement at Forked River Service Area
MTB LLC Neptune City, NJ
$166,450.00
2013
February
Construction & Maintenance
Resurfacing Mile 74 to Mile 122
Crisdel Group, Inc. South Plainfield, NJ
$8,624,000.00
2013
February
Construction & Maintenance
Culvert Repairs, Milepost 100 to 140
J. Fletcher Creamer & Son, Inc. & Joseph M. Sanzari, Inc. A Joint Venture Hackensack, NJ
$8,862,991.56
2013
February
Construction & Maintenance
Roof Replacement at Interchange 16/18E Office
VMG Group Roselle, NJ
$82,405.00
2013
February
Construction & Maintenance
Roof Replacement at Monmouth Service Area
VMG Group Roselle, NJ
$153,437.00
2013
February
Construction & Maintenance
Roof Replacement at Molly Pitcher Service Area
Winchester Roofing Corp. Turnersville, NJ
$388,750.00
2013
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 126
Joseph M. Sanzari, Inc. Hackensack, NJ
$5,497,919.80
2013
January
Construction & Maintenance
Great Bay Boulevard Public Access Site Great Bay Boulevard Little Egg Harbor Township, Ocean County
South State, Inc. Bridgeton, NJ
$911,657.00
2013
January
Construction & Maintenance
New Jersey Turnpike Bridge Repairs and Resurfacing Milepost 0 to 122, Newark Bay Hudson County Extension and The Pearl Harbor Memorial Turnpike Extension
Joseph M. Sanzari, Inc. Hackensack, NJ
$8,418,639.25
2012
December
Construction & Maintenance
Construction of Troop D Moorestown Station Turnpike Milepost 37.0 NB and Galloway Station Parkway Milepost 42.0
Hall Building Corp. Farmingdale, NJ
$26,957,887.75
2012
December
Construction & Maintenance
Interchange 9, 10 and 11 Milepost 7.5 to Milepost 11.9 Township of Middle Cape May County
Richard E. Pierson Construction Co., Inc. Pilesgrove, NJ
$71,736,840.44
2012
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing, Milepost 83 to 122 and NB-HCE
D'annunzio & Sons, Inc. Clark, NJ
$11,707,000.00
2012
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172
Joseph M. Sanzari, Inc. Hackensack, NJ
$6,999,076.00
2012
December
Construction & Maintenance
Sign Structures Advanced Fabrication Contract
Cornell & Company, Inc. Westville, NJ
$6,271,000.00
2012
October
Construction & Maintenance
Replacement of PNC Bank Arts Center Amphitheater Roof Milepost 116 NB Township of Holmdel, Monmouth County
Pravco Rahway, NJ
$2,534,552.38
2012
October
Construction & Maintenance
Drainage Repairs (2012) Milepost 117 to Milepost 122
Gardner M. Bishop, Inc. White Plains, NY
$1,561,110.00
2012
October
Construction & Maintenance
Construction of Troop D Bloomfield Station Milepost 153.0 NB
Joseph A. Natoli Construction Corp. Pine Brook, NJ
$12,277,000.00
2012
September
Construction & Maintenance
Interchange 9 Improvements
Gardner M. Bishop, Inc., White Plains, NY
$27,683,283.90
2012
September
Construction & Maintenance
Bridge Deck Reconstruction and Miscellaneous Improvements, Newark Bay-Hudson County Extension, Milepost N6.00 To N8.20
El Sol Contracting & Construction Corp. Maspeth, NY
$68,217,000.00
2012
August
Construction & Maintenance
ETC Phase II UPS Upgrade Project Eleven Select Toll Plaza Locations Various Counties
PKF-Mark III, Inc. Newton, PA
$599,315.00
2012
August
Construction & Maintenance
Garden State Parkway Shoulder, Restoration and Improvements Milepost 93.5 to 99.5
Northeast Remsco Construction Farmingdale, NJ
$100,971,697.05
2012
August
Construction & Maintenance
Garden State Parkway Shoulder, Restoration and Improvements Milepost 83.5 to 88.5
George Harms Construction Co. Farmingdale, NJ
$84,262,835.93
2012
August
Construction & Maintenance
Garden State Parkway Shoulder, Restoration and Improvements Milepost 90.5 to 93.5
Midlantic Construction, LLC Barnegat, NJ
$74,955,981.77
2012
August
Construction & Maintenance
Interchange 88 Improvements Milepost 88.5 to 90.5
Earle Asphalt Company. Farmingdale, NJ
$70,059,913.13
2012
August
Construction & Maintenance
Interchange 6 to 9 Widening Program Brookland Mitigation Site Township of Monroe Middlesex County
C. Abbonizio Contractors, Inc. Sewell, NJ
$7,048,461.52
2012
July
Construction & Maintenance
Security Fencing and Access Restriction
IEW Construction Group, Inc. Trenton, NJ
$2,937,472.26
2012
July
Construction & Maintenance
Repainting of Structural Steel and Miscellaneous Improvements to GSP NB Bridge over Raritan River and Smith Street, Structure No. 127.2N Woodbridge Township and Borough of Sayreville Middlesex County, New Jersey
Allied Painting, Inc. Cherry Hill, NJ
$22,289,395.00
2012
June
Construction & Maintenance
Resurfacing Milepost 0 to 74
A. E. Stone, Inc. Egg Harbor, NJ
$3,592,532.50
2012
May
Construction & Maintenance
Guide Rail and Impact Attenuator Mainteance and Repair on the New Jersey Turnpike and Garden State Parkway
J. Fletcher Creamer & Son, Inc. Hacksensack, NJ
$8,886,116.00
2012
May
Construction & Maintenance
Salt Dome & Sleep Trailer at Garden State Parkway Asbury Maintenance Yard Borough of Tinton Falls County of Monmouth
Alna Construction Corp. Secaucus, NJ
$876,500.00
2012
April
Construction & Maintenance
Storage Building at New Jersey Turnpike Southern Division, Maintenance District No. 2
Benjamin R. Harvey Company, Inc. Ocean, NJ
$915,000.00
2012
April
Construction & Maintenance
Resurfacing Milepost 74 to 122
Crisdel Group, Inc. Union, NJ
$7,584,491.00
2012
March
Construction & Maintenance
Roof Replacement at Maintenance District 4
Alper Enterprises, Inc. Moorestown, NJ
$171,000.00
2012
March
Construction & Maintenance
Vehicle Wash Facility Turnpike Milepost 101.7
M & M Construction Co, Inc. Union, NJ
$1,723,000.00
2012
February
Construction & Maintenance
Central Pavement Restoration and Misc. Improvements Milepost 80-143
C. J. Hesse, Inc. Atlantic Highlands, NJ
$7,970,560.00
2012
February
Construction & Maintenance
Interchange 6 to 9 Widening Program NSO/NSI/SNI/SNO Roadway and Service Area 7S Ramps Grading, Drainage, Paving, Structures and Lighting Milepost 70.6 to 82.6
Tetra Tech Construction, Inc. Gloversville, NY
$118,341,667.52
2012
February
Construction & Maintenance
Rehabilitation of Concrete Median Barrier Milepost 141-150
Gardner M. Bishop Inc. White Plains, NY
$23,595,530.82
2012
January
Construction & Maintenance
Culvert Repairs Milepost 118.5 and 121.5
Northeast Remsco Construciton, Inc Farmingdale, NJ
$6,145,182.50
2012
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172
Joseph M. Sanzari, Inc. Hackensack, NJ
$7,449,656.00
2012
January
Construction & Maintenance
Bridge Deck Repairs and Resurfacing Milepost 0 to Milepost 122, NB-HCE and PHMTE
Joseph M. Sanzari, Inc. Hackensack, NJ
$10,149,864.00
2012
January
Construction & Maintenance
Installation of Variable Message Signs at New and Existing Locations on the Turnpike
Agate Construction Co. Inc. Ocean View, NJ
$15,421,164.31
2012
January
Construction & Maintenance
Resurfacing Various Service Areas Milepost 0 to 118
Schifano Construction Corp. Middlesex, NJ
$6,995,911.00
2011
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing Milepost 83 to Milepost 122 and the NB-HCE
D'Annunzio & Sons, Inc. Clark, NJ
$12,117,000.00
2011
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing: Milepost 0 to Milepost 126
IEW Construction Group, Inc. Trenton, NJ
$6,260,053.02
2011
December
Construction & Maintenance
Roadway Improvements: Interchanges 157 & 161 - Grading, Paving and Lighting
Tilcon New York, Inc. Wharton, NJ 07885
$1,978,582.00
2011
December
Construction & Maintenance
Pavement Restoration and Miscellaneous Improvements at Various Service Areas: Milepost 0 to Milepost 172.4
Joseph Defino Trucking d/b/a Defino Contracting Co. Cliffwood, NJ 07735
$4,747,000.00
2011
December
Construction & Maintenance
Roadway Improvements: Interchange 154 and 155P - Grading, Paving, Lighting and Retaining Walls
Creamer-Sanzari, a Joint Venture Hackensack, NJ 07601
$8,529,005.50
2011
October
Construction & Maintenance
Improvements at Interchange 2 Milepost 12.9
South State, Inc. Bridgeton, NJ
$3,486,897.97
2011
October
Construction & Maintenance
Installation of Variable Message Signs at New and Existing Locations on the Turnpike and Parkway
PKF-Mark III, Inc. Newton, PA
$21,653,620.80
2011
October
Construction & Maintenance
Installation of Variable Message Signs at New and Existing Locations on the Parkway
PKF-Mark III, Inc. Newton, PA
$9,985,679.22
2011
September
Construction & Maintenance
Construction Management/General Contracting Services for the New Jersey Turnpike Security Program
Tishman Construction Corporation of NJ Newark, NJ
$79,225,000.00
2011
September
Construction & Maintenance
Left Shoulder Restoration Milepost 0 to 28
A.E. Stone Egg Harbor, NJ
$2,531,202.00
2011
August
Construction & Maintenance
Interchange 48 to 63 Widening Project GSP Milepost 57.8 to Milepost 64.9 Township Of Eagleswood, Ocean County Township Of Little Egg Harbor, Ocean County Township Of Stafford, Ocean County
Midlantic Construction, LLC Barnegat, NJ
$8,713,399.00
2011
August
Construction & Maintenance
Interchange 48 to 63 Widening Project GSP Milepost 57.8 to Milepost 64.9 Township Of Eagleswood, Ocean County Township Of Little Egg Harbor, Ocean County, Township Of Stafford, Ocean County
Earle Asphalt Company Farmingdale, NJ
$52,063,413.13
2011
August
Construction & Maintenance
VMS Structures Advanced Fabrication Contract
RCC Fabricators, Inc. Southampton, NJ
$4,681,219.00
2011
August
Construction & Maintenance
Interchange 48 To 63 Widening Milepost 47.7 to Milepost 51.3 City of Port Republic, Atlantic County Township of Bass River, Burlington County
Midlantic Construction, LLC Barnegat, NJ
$50,617,232.44
2011
August
Construction & Maintenance
Interchange 48 To 63 Widening Project GSP Milepost 52.4 to Milepost 57.8 Township of Bass River, Burlington County Township of Little Egg Harbor, Ocean County
Richard E. Pierson Construction Co., Inc.
$46,657,170.60
2011
July
Construction & Maintenance
Interchange 6 to 9 Widening Program NSO/ SNO Roadways Grading, Drainage, Paving, and Structures Milepost 68.3 to 69.3 Townships of East Windsor and Cranbury Mercer and Middlesex
Union Paving and Construction Company Mountainside, NJ
$34,460,317.73
2011
July
Construction & Maintenance
Operational and Access Improvements at Interchange 168 NB Exit Ramp Paving and Lighting, Milepost 167.0 to 167.5 Township of Washington, Bergen County
Tilcon New York Wharton, NJ
$938,291.00
2011
June
Construction & Maintenance
Central Pavement Restoration and Miscellaneous Improvements, Milepost 80 to 143
Earle Asphalt Company Farmingdale, NJ
$4,077,813.13
2011
April
Construction & Maintenance
Installation of Variable Message Signs at New and Existing Locations on the Turnpike
PKF-Mark III, Inc. Newton, PA
$12,689,317.50.00
2011
April
Construction & Maintenance
Resurfacing Milepost 74 to 122
Crisdel Group, Inc South Plainfield, NJ
$5,476,000.00
2011
March
Construction & Maintenance
Resurfacing Milepost 0 to 74
Crisdel Group South Plainfield, NJ
$5,286,000.00
2011
February
Construction & Maintenance
Major Bridge Perimeter Fencing
Joseph M. Sanzari, Inc Hackensack, NJ
$6,980,350.00
2011
February
Construction & Maintenance
Northern Pavement Restoration and Miscellaneous Improvements Milepost 143 to 172.4
Intercounty Paving Associates, LLC Hackettstown, NJ
$10,212,323.23
2011
January
Construction & Maintenance
Widening and Rehabilitation of Bass River Bridge Milepost 51.9
Northeast Remsco Construction Inc. Farmindale, NJ
$55,814,955.25
2011
January
Construction & Maintenance
Garden State Parkway Replacement of the Watchung Avenue Bridges Milepost 152.4
Union Paving & Construction Co., Inc. Mountainside, NJ
$10,688,775.05
2011
January
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 126 to 172
Railroad Construction Co, Inc. Paterson, NJ
$6,954,008.50
2011
January
Construction & Maintenance
Replacement of ETC Shelter at Interchange 7 Toll Utility Building
Rocon Contracting, Inc. Brielle, NJ
$203,697.00
2011
January
Construction & Maintenance
New Jersey Turnpike Bridge Repairs and Resurfacing Milepost 0 to 122, the Newark Bay-Hudson County Extension And the Pearl Harbor Memorial Turnpike Extension
Gardner M. Bishop Inc. White Plains, NY
$8,774,245.00
2010
December
Construction & Maintenance
Widening and Rehabilitation of Patcong Creek Bridge, M.P. 30.7 to 31.3
Midlantic Construction, L.L.C. Barnegat, NJ
$16,820,346.82
2010
December
Construction & Maintenance
Bridge Deck Repairs and Resurfacing Milepost 83 to 122 and the Newark Bay-Hudson County Extension
Joseph M. Sanzari, Inc. Hackensack, NJ
$11,999,644.00
2010
December
Construction & Maintenance
Bridge Repairs and Resurfacing Milepost 0 to 126
Gardner M. Bishop, Inc. White Plains, NY
$5,482,275.00
2010
December
Construction & Maintenance
Replacement of Service Area Signs at Various Locations on the Turnpike
M. L. Ruberton Construction Co. Folsom, NJ
$324,255.00
2010
December
Construction & Maintenance
Interchange 6 to 9 Widening Program NSO/NSI/SNI/SNO Roadways Grading, Drainage, Paving, Structures and Lighting, Milepost 69.3 to Milepost 70.6 Township of Cranbury
The Delaney Group, Inc. Gloversville, NY
$59,718,281.57
2010
October
Construction & Maintenance
UST Removal and Upgrade at Various New Jersey Turnpike and Garden State Parkway Facilities
Palmer West Associates, Inc. t/a A & J Construction Co. Farmingdale, NJ
$1,316,470.00
2010
October
Construction & Maintenance
Advance Clearing for GSP Widening Milepost 30 to 64.5
The Delaney Group Gloversville, NY
$5,933,809.00
2010
October
Construction & Maintenance
New Jersey Turnpike and Garden State Parkway Immediate Repair of Facilities and Utilities
Hall Building Corp. Farmingdale, NJ
7.80% Weighted Average Fee
2010
October
Construction & Maintenance
Immediate Repairs , Mile 0 to Mile 122 New Jersey Turnpike and Mile 0 to Mile 172 Garden State Parkway
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
4.30% Weighted Average Fee
2010
October
Construction & Maintenance
Advanced Sign Structure Fabrication - Overhead
Lehigh Fabrication, LLC Edison, NJ
$3,689,393.00
2010
October
Construction & Maintenance
Interchange 6 to 9 Widening Program Service Areas 6S & 6N & NSO/SNO Roadways Grading, Drainage, Paving, Structures & Lighting, Milepost 56.5 to 59.7 Townships of Chesterfield, Hamilton & Robbinsville
South State, Inc. Bridgeton, NJ
$144,139,490.97
2010
September
Construction & Maintenance
Interchange 6 to 9 Widening Program Interchange 8 - Ramps and NSO/SNO Roadways Grading, Drainage, Paving, Structures & Lighting, Milepost 66.7 to 68.3 Township of East Windsor
PKF Mark III, Inc. Newtown, PA
$110,496,508.58
2010
September
Construction & Maintenance
Installation of PNC Bank Arts Center Amphitheater Improvements - Phase II
Breaker Electric, Inc. Clarksburg, NJ
$456,288.00
2010
September
Construction & Maintenance
Service Area 3S Sewage Pump Station Replacement
B & H Contracting, Inc. Folsom, NJ
$360,100.00
2010
September
Construction & Maintenance
Roof Replacement at Various Locations
Arch-Concept Construction, Inc. North Haledon, NJ
$344,000.00
2010
September
Construction & Maintenance
Vehicle Wash Facility at Garden State Parkway Maintenance District 4
McCauley Construction Co., Inc. Hazlet, NJ
$1,392,900.00
2010
September
Construction & Maintenance
Roofing Upgrades
G & M Eastern Contracting, Inc. Neptune City, NJ
$266,625.00
2010
August
Construction & Maintenance
Interchange 6 to 9 Widening Program Interchange 8 - Utilities & Offsite Improvements, Milepost 67.5, Township of East Windsor
Crisdel Group, Inc. and Sordoni Construction Co. A Joint Venture South Plainfield, NJ
$7,169,065.71
2010
August
Construction & Maintenance
Interchange 6 to 9 Widening Program Interchange 7A - Toll Lanes, Ramps and NSO/SNO Roadways, Grading, Drainage, Paving, Structures & Lighting Milepost 59.7 to 62.0, Twp. of Robbinsville
PKF-Mark III Inc. Newtown, PA
$111,999,291.14
2010
July
Construction & Maintenance
Turnpike and Parkway Right of Way and Security Fencing
Consolidated Steel & Aluminum Fence Co., Inc. Kenilworth, NJ
$1,959,580.00
2010
July
Construction & Maintenance
Interchange 6 to 9 Widening Program Interchange 8 Toll Plaza Grading, Drainage, Paving & Structures Milepost 67.5, Township of East Windsor
Crisdel Group, Inc. South Plainfield, NJ
$9,896,022.80
2010
July
Construction & Maintenance
Water Treatment Facility Improvements at Service Area 4N
J. Fletcher Creamer & Son, Inc. Hackensack, NJ
$576,014.00