Clicky

skip to main content
DOING BUSINESS WITH THE NJTA

Construction & Maintenance

On this page, you will find links to websites, materials, and forms you will need to compete for NJTA construction and maintenance contracts. The links in the green box allow you to search current solicitations, research past solicitations, or review the current Anticipated Construction Contracts for future opportunities.

 

Contractor Resources

BidExpress

BidX provides prospective contractors the opportunity to review current construction projects, to buy plans or specifications, to view planholders lists, to review bid results, and to register for electronic bidding.

CapEx

CapEx is used for inquiries during a construction contract's bid period and for construction management after award. All contractors interested in working with the Authority are encouraged to register in CapEx.

Qualified Products List (QPL)

 

The Authority’s QPL program provides a dynamic and up‐to‐date list of products to the contracting and engineering community, and it allows manufacturers and suppliers to submit their products through a streamlined, paperless approval system. Specifically:

  • The QPL is located on CapEx, viewable by any user.
  • The QPL centralizes all products which may potentially be proposed for use on Authority construction projects and organizes them according to their Specification Subsection.
  • The QPL contains product names and/or model numbers, vendor contact information, and the product’s corresponding Specification Subsection.
  • The Standard Specifications (as amended by the Supplementary Specifications) contains the criteria upon which products are qualified.

Note that the QPL is not intended for use with Contracts designed under the 2004 Standard Specifications.

 

Contractors and Vendors are directed to follow the QPL Manual 02-13-2023

Design Engineers are directed to follow the CapEx & Specifications Design Guidelines  

Resident Engineers are directed to follow the QPL Guidelines for Resident Engineers  04-06-2022 
and to download the associated CPL Form  03-07-2024

and Pending Product Form Q1 04-06-2022

 

 

 

Policies & Procedures

Contractor Prequalification Requirements
Contractor Prequalification Requirements
Code of Ethical Standards
Code of Ethical Standards
NJTA Health and Safety Plan (HASP) Manual
NJTA Health and Safety Plan (HASP) Manual