Clicky

skip to main content
DOING BUSINESS WITH THE NJTA

Document Change Announcements

FILTER BY

2016 Standard Specifications DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

Guide Rail Anchorages and Buried End Terminals
DATE

March 25, 2025

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 510 Guide Rail, Subsection 510.03 Methods of Construction Section 915 Beam Guide Rail, Subsection 915.02 Posts and Recycled/Synthetic Blockouts, Subsection 915.03 Miscellaneous Hardware, Subsection 915.07 Terminals and Anchorages

DOCUMENT CHANGE MEMO

DCA2025SS 03

Subcontractor Reporting Requirements
DATE

March 4, 2025

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 103 Award And Execution Of Contract, Subsection 103.04 Subletting and Assigning Contract

DOCUMENT CHANGE MEMO

DCA2025SS 02

Workplace Accountability in Labor List (WALL)
DATE

January 28, 2025

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.23 Workplace Accountability in Labor List (WALL)

DOCUMENT CHANGE MEMO

DCA2025SS 01

Alloy Specification for Sign Panels
DATE

December 31, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 912 Sign Materials, Subsection 912.01 Aluminum Sheet Sign Panels and Incidental Hardware.

DOCUMENT CHANGE MEMO

DCA2024SS 10

Prefabricated Modular Wall Height
DATE

December 31, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 427 Prefabricated Modular (PM) Walls, Subsection 427.02 Materials

DOCUMENT CHANGE MEMO

DCA2024SS 09

Soil Stabilization Matting
DATE

August 27, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 101 General Information, Subsection 101.01 Headings, Subsection 101.02 Definitions Section 208 Temporary Soil Erosion And Dust Control, Subsection 208.01 Description Subsection 208.02 Materials, Subsection 208.03 Methods of Construction, Subsection 208.05 Payment Section 213 Regulated Material, Subsection 213.03 Methods of Construction Section 703 Topsoiling, Subsection 703.03 Methods of Construction Section 704 Seeding and Sodding, Subsection 704.02 Materials, Subsection 704.03 Methods of Construction Section 706 Soil Stabilization Matting, Subsection 706.02 Materials Subsection 706.03 Methods of Construction, Subsection 706.04 Measurement, Subsection 706.05 Payment Section 919 Landscaping Materials, Subsection 919.10 Seed, Subsection 919.15 Emulsified Asphalt Subsection 919.35 Soil Stabilization Matting

DOCUMENT CHANGE MEMO

DCA2024SS 08

Inlet or Manhole Casting
DATE

August 27, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 503 Manholes and Inlets, Subsection 503.03 Methods of Construction

DOCUMENT CHANGE MEMO

DCA2024SS 07

QPL Qualification Criteria Updates
DATE

August 27, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 101 General Information, Subsection 101.02 Definitions Section 905 Concrete, Mortar and Grout, Subsection 905.15 Non-Shrink, High Early Strength Mortar Subsection 905.18 Epoxy Bonding Coat, Subsection 905.25 Non-shrink, High Early Strength Mortar Suitable for Vertical and Overhead Repairs Section 923 Miscellaneous, Subsection 923.08 Epoxy Bonding Compound, Subsection 923.22 Epoxy Resin System, Subsection 923.23 Epoxy Crack Sealant

DOCUMENT CHANGE MEMO

DCA2024SS 06

Miscellaneous Updates
DATE

August 12, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.08 Power of Attorney, Subsection 102.09 Submitting Proposals, Subsection 102.13 Prevailing Wage Rates

DOCUMENT CHANGE MEMO

DCA2024SS 05

Source Disclosure Form Removal
DATE

July 16, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.09 Submitting Proposals Subsection 102.23 Source Disclosure Form

DOCUMENT CHANGE MEMO

DCA2024SS04

Pre-stained Reactive Color Treatment Update
DATE

February 29, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 510 Guide Rail, Subsection 510.02 Materials, Subsection 510.03 Methods of Construction Section 915 Beam Guide Rail, Subsection 915.01 Rail Elements, Subsection 915.03 Miscellaneous Hardware

DOCUMENT CHANGE MEMO

DCA2024SS 02

Electrical Qualification Criteria Updates
DATE

January 9, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 601 Common Electrical Provisions, Subsection 601.01 Description Section 602 Power Distribution, Subsection 602.01 Description Section 603 Lighting, Subsection 603.01 Description Section 918 Electrical Materials, Subsection 918.01 General

DOCUMENT CHANGE MEMO

DCA2024SS 01

Metallization of New Weathering Steel
DATE

October 18, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 440 Metallization for New Weathering Steel, Subsection 440.01 Description Subsection 440.02 Materials, Subsection 440.03 Methods of Construction, Subsection 440.04 Measurement, Subsection 440.05 Payment Section 913 Paints and Coatings, Subsection 913.10 Metallizing Wire

DOCUMENT CHANGE MEMO

DCA2023SS 14

Crack Spanning Membrane
DATE

October 11, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 302 Hot Mix Asphalt (HMA) Pavements, Subsection 302.05 Methods of Construction Section 923 Miscellaneous, Subsection 923.24 Crack Spanning Membrane

DOCUMENT CHANGE MEMO

DCA2023SS 13

Precast Concrete Construction Barrier (PCCB) Update
DATE

September 22, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 801 Traffic Control on Authority Roadways, Subsection 801.03 Methods of Construction Section 920 Traffic Control Devices, Subsection 920.08 Concrete Barrier

DOCUMENT CHANGE MEMO

DCA2023SS 12

Miscellaneous Updates III
DATE

September 8, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.09 Submitting Proposals, Subsection 102.21 Prohibited Activities in Russia or Belarus, Section 104 Control Of Work, Subsection 104.13 Sanitary, Health and Safety Provisions

DOCUMENT CHANGE MEMO

DCA2023SS 11

Railroad Coordination
DATE

August 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 104 Control Of Work, Subsection 104.08 Shop and Working Drawings, Section 106 Legal Relations And Responsibility, Subsection 106.20 Insurance, Section 804 Railroads, Subsection 804.03 Methods of Construction

DOCUMENT CHANGE MEMO

DCA2023SS 10

Cone Truck
DATE

June 30, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 801 Traffic Control on Authority Roadways, Subsection 801.02, Subsection 801.03 Methods of Construction, Section 920 Traffic Control Devices, Subsection 920.18 Truck Mounted Attenuator, Subsection 920.21 Cone Truck

DOCUMENT CHANGE MEMO

DCA2023SS 07

Elections Transparency Act
DATE

June 30, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement for Proposals. Appendix B, Requirements of Public Law 2005, Chapter 51 (Executive Order 134) and Executive Order 117, Section 102 Bidding Requirements And Conditions, Subsection 102.17 Public Law 2005, Chapter 51 and (Executive Order 134) & Executive Order 117

DOCUMENT CHANGE MEMO

DCA2023SS 09

Continuous Hot-Dip Galvanized Reinforcement Steel
DATE

June 30, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 401 Concrete Structures, Subsection 401.02 Materials, Subsection 401.09 Reinforcement Steel, Section 908 Reinforcement Steel, Subsection 908.01 Reinforcement Steel for Structures. Section 909 Structural Steel and Other Ferrous Metals, Subsection 909.11 Zinc Coating on Steel.

DOCUMENT CHANGE MEMO

DCA2023SS 08 With Hidden Text

Miscellaneous Updates II
DATE

March 29, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 101 General Information, Subsection 101.02 Definitions, Section 102 Bidding Requirements And Conditions, Subsection 102.21 Prohibited Activities in Russia or Belarus

DOCUMENT CHANGE MEMO

DCA2023SS-05.pdf

Structural QPL Qualification Criteria Updates
DATE

March 29, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 401 Concrete Structures, Section 407 High-Load Multi-rotational Bearings, Section 414 Bridge Railing and Fencing, Section 417 Bridge Deck Rehabilitation, Section 418 Bridge Structural Repairs, Section 425 Noise Barriers Section 905 Concrete, Mortar and Grout, Subsection 905.12 Non-Shrink, High Strength Mortar Subsection 905.13 Non-Metallic, Non-Shrink Mortar or Grout Subsection 905.14 Non-Shrink, High-Strength Mortar, Subsection 905.15 Non-Shrink, High Early Strength Mortar, Subsection 905.24 Mortar Seal and Cure, Subsection 905.25 Non-shrink, High Early Strength Mortar Suitable for Vertical and Overhead Repairs, Subsection 905.28 Bag Mixes for Concrete Repairs Section 907 Joints, Subsection 907.02 Joint Sealers, Section 909 Structural Steel and Other Ferrous Metals, Subsection 909.01 Structural Steel, Section 910 Timber and Timber Preservatives, Subsection 910.13 Fire Retardant Treatment, Section 911 Non-Ferrous Metals, Subsection 911.07 Bronze Bearing Plates, Section 923 Miscellaneous, Subsection 923.05 Caulking Compound, Subsection 923.06 Dampproofing and Waterproofing, Subsection 923.08 Epoxy Bonding Compound, Subsection 923.22 Epoxy Resin System, Subsection 923.23 Epoxy Crack Sealant, Subsection 923.28 Sealant

DOCUMENT CHANGE MEMO

DCA2023SS-06.pdf

Fuel and Asphalt Price Adjustment
DATE

March 9, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 108 Measurement And Payment, Subsection 108.10 Fuel Price Adjustment Section 302 Hot Mix Asphalt (HMA) Pavements, Subsection 302.09 Measurement

DOCUMENT CHANGE MEMO

DCA2023SS-04.pdf

Concrete Test Cylinders
DATE

February 28, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 401 Concrete Structures, Subsection 401.16 Test Specimens Section 905 Concrete, Mortar and Grout, Subsection 905.22 Quality Acceptance Testing, Sampling, and Inspection for Portland Cement Concrete

DOCUMENT CHANGE MEMO

DCA2023SS-03.pdf

Mobilization Clarification
DATE

February 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 104 Control of Work, Subsection 104.10 Mobilization

DOCUMENT CHANGE MEMO

DCA2023SS-02.pdf

Miscellaneous Updates
DATE

January 19, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement for Proposals, Section 101 General Information, Subsection 101.02 Definitions Section 102 Bidding Requirements And Conditions, Subsection 102.09 Submitting Proposals, Subsection 102.10 Withdrawing Proposal, Subsection 102.11 Causes for Rejection, Subsection 102.18 Disclosure of Investment Activities in Iran, Subsection 102.21 Prohibited Activities in Russia or Belarus, Subsection 102.23 Source Disclosure Form, Section 106 Legal Relations And Responsibility, Subsection 106.02 Laws and Ordinances, Subsection 106.24 Small Business Enterprise Program Section 107 Prosecution And Progress, Subsection 107.11 Lane and Roadway Occupancy Charges Section 108 Measurement And Payment, Subsection 108.01 Measurement of Quantities Section 801 Traffic Control on Authority Roadways, Subsection 801.03 Methods of Construction

DOCUMENT CHANGE MEMO

DCA2023SS 01

Steel Price Adjustment
DATE

November 22, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 108 Measurement And Payment, Subsection 108.11 Steel Price Adjustment

DOCUMENT CHANGE MEMO

DCA2022SS- 05.pdf

Pre-stained Guide Rail Update
DATE

August 24, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 510 Guide Rail, Subsection 510.01 Description Section 915 Beam Guide Rail, Subsection 915.01 Rail Elements

DOCUMENT CHANGE MEMO

DCA2022SS-04.pdf

Certification of Non-Debarment
DATE

August 11, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsections 102.09 Submitting Proposals, 102.11 Causes for Rejection, 102.22 Certification of Non-Debarment

DOCUMENT CHANGE MEMO

DCA2022SS-03.pdf

Prohibited Activities in Russia or Belarus
DATE

April 22, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.09 Submitting Proposals Subsection 102.21 Prohibited Activities in Russia or Belarus

DOCUMENT CHANGE MEMO

DCA2022SS-02.pdf

Manhole Frame and Cover & Inlet Frames and Grates
DATE

February 17, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 503 Manhole and Inlets, Subsection 503.03 Methods of Construction Section 909 Structural Steel and Other Ferrous Metals Subsection 909.04 Casting and Forgings

DOCUMENT CHANGE MEMO

DCA2022SS-01.pdf

Resurfacing Materials
DATE

December 15, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 302 Subsection 302.02 Materials Subsection 302.05 Methods of Construction, Subsection 302.10 Payment Section 903 Subsection 903.01 Composition, Subsection 903.04 Tables Section 904 Subsection 904.02 Tack Coat, Subsection 904.11 Polymerized Joint Adhesive

DOCUMENT CHANGE MEMO

DCA2021SS-09.pdf

Appendix I
DATE

December 15, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix I-NJPDES Stormwater Permit Program

DOCUMENT CHANGE MEMO

DCA2021SS-08.pdf

Lighting and Power Distribution Systems
DATE

November 23, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 104 Control Of Work, Subsection 104.08 Shop and Working Drawings Section 105 Control Of Materials, Subsection 105.07 Storage of Materials and Staging Areas Section 106 Legal Relations And Responsibility, Subsection 106.18 Utilities Section 601 Common Electrical Provisions, Various Subsections Section 602 Power Distribution, Various Subsections, Section 603 Lighting, Various Subsections, Section 918 Electrical Materials, Various Subsections

DOCUMENT CHANGE MEMO

DCA2021SS-07.pdf (1)

Compliance Updates III
DATE

October 19, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.04 Familiarity with Work, Subsection 102.11 Causes for Rejection, Subsection 102.16 Business Registration Act, Subsection 102.20 Diane B. Allen Equal Pay Act, Section 105 Control Of Materials, Subsection 105.01 Materials, Section 106 Legal Relations And Responsibility, Subsection 106.19 Risks Assumed By The Contractor, Subsection 106.24 Small Business Enterprise Program, Subsection 106.27 Disabled Veteran-owned Business Program, Section 107 Prosecution And Progress, Subsection 107.02 Pre-Construction Meeting

DOCUMENT CHANGE MEMO

DCA2021SS-06.pdf

Longitudinal Barriers
DATE

August 6, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 508 Concrete Median Barrier, Section 510 Guide Rail, Section 524 Impact Attenuator, Section 801 Traffic Control on Authority Roadways, Section 915 Beam Guide Rail Section 920 Traffic Control Devices

DOCUMENT CHANGE MEMO

DCA2021SS-05.pdf

Compliance Updates II
DATE

May 7, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.09 Submitting Proposals, Subsection 102.11 Causes for Rejection, Subsection 102.15 Public Works Contractor Registration Act Subsection 102.18 Disclosure of Investment Activities in Iran, Section 104 Control Of Work, Subsection 104.03 Plans and Specifications

DOCUMENT CHANGE MEMO

DCA2021SS-04.pdf

Disclosure of Investment Activities in Iran
DATE

March 25, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements And Conditions, Subsection 102.11 Cause for Rejection

DOCUMENT CHANGE MEMO

DCA2021SS-03.pdf

Mechanically Stabilized Earth (MSE) Wall Design
DATE

March 18, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 426 Mechanically Stabilized Earth (MSE) Wall Section 925 Mechanically Stabilized Earth (MSE) Wall

DOCUMENT CHANGE MEMO

DCA2021SS-02.pdf

Compliance Updates
DATE

February 3, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement, Section 102 Subsection 102.19, Section 104 Subsection 104.13, Appendix V, Appendix X

DOCUMENT CHANGE MEMO

DCA2021SS-01.pdf

CCTV Surge Protector and Video Encoder
DATE

November 5, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

918.34 Video Encoder 918.51 CCTV Surge Protector

DOCUMENT CHANGE MEMO

DCA2020SS-08.pdf

Sanitary, Health and Safety Precautions
DATE

September 9, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 104 Control of Work, Subsection 104.13 Sanitary, Health and Safety Precautions

DOCUMENT CHANGE MEMO

DCA2020SS-07.pdf

Public Works Contractor Registration
DATE

August 31, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

102.09 Submitting Proposals 102.16 Business Registration Act

DOCUMENT CHANGE MEMO

DCA2020SS-06.pdf

Intelligent Transportation Systems (ITS)
DATE

August 31, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

605.01 Description 605.03 Methods of Construction 918.19 System Controller Cabinet (SCC) 918.52 Variable Message Signs (VMS) 918.54 Hybrid Changeable Message Sign (HCMS)

DOCUMENT CHANGE MEMO

DCA2020SS-05.pdf

Contaminated Soil and Groundwater Management
DATE

August 19, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

216.04 Health and Safety Plan 216.06 Waste Characterization

DOCUMENT CHANGE MEMO

DCA2020SS-04.pdf

Qualified Products List Criteria Updates
DATE

May 22, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 407 Subsection 407.02, 407.03 Section 408 Subsection 408.02, 408.03 Section 409 Subsection 409.03 Section 417 Subsection 417.02 Section 426 Subsection 426.02 Section 904 Subsection 904.06 Section 918 Subsection 918.02 Section 920 Subsection 920.11

DOCUMENT CHANGE MEMO

DCA2020SS-03.pdf

Disabled Veteran-Owned Businesses
DATE

May 22, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix V Section 106, Subsection 106.27

DOCUMENT CHANGE MEMO

DCA2020SS-02.pdf

Appendix X
DATE

March 6, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix X Updates

DOCUMENT CHANGE MEMO

DCA2020SS-01.pdf

ACH Payment
DATE

December 19, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

103.02 Execution of Contract

DOCUMENT CHANGE MEMO

DCA2019SS-09.pdf

Miscellaneous Updates 2019
DATE

December 18, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement, 104.07, Appendix B, Appendix X

DOCUMENT CHANGE MEMO

DCA2019SS-08.pdf

Qualified Products List (QPL) Program Updates
DATE

October 16, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 104 Control of Work, Subsection 104.03 Plans and Specifications Section 105 Control of Materials, Subsection 105.01 Materials

DOCUMENT CHANGE MEMO

DCA2019SS-07.pdf

Pre-Construction Conference
DATE

August 19, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 101 General Information Subsection 101.02 Definitions Section 107 Prosecution and Progress, Subsection 107.02 Pre-Construction Conference

DOCUMENT CHANGE MEMO

DCA2019SS-06.pdf

Appendix X Small Business Enterprise Program
DATE

May 24, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix X Section 106.24

DOCUMENT CHANGE MEMO

DCA2019SS-05.pdf

Project Bids - Electronic Bidding Update
DATE

April 16, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement for Proposals Section 102 Bidding Requirements And Conditions, Subsection 102.16 Business Registration Act Section 102 Bidding Requirements And Conditions, Subsection 102.19 Ethics Standards (Executive Order 189) Section 106 Legal Relations And Responsibility, Subsection 106.02 Laws and Ordinances Section 106 Legal Relations And Responsibility, Subsection 106.10 Permits, Licenses and Taxes

DOCUMENT CHANGE MEMO

DCA2019SS-04.pdf

Insurance Update
DATE

March 21, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

106.20 Insurance

DOCUMENT CHANGE MEMO

DCA2019SS-02.pdf

Insurance Certificates – Electronic Submission
DATE

March 1, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

106.20 Insurance

DOCUMENT CHANGE MEMO

DCA2019SS-03.pdf

Public Works Contractor Registration
DATE

January 25, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

102.15 Public Works Contractor Registration Act

DOCUMENT CHANGE MEMO

DCA2019SS-01.pdf

Final Cleaning Up
DATE

November 5, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

109.01 Final Cleaning Up

DOCUMENT CHANGE MEMO

DCA2018SS-10.pdf

Precast Concrete Construction Barrier
DATE

October 31, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

801.03 Methods of Construction

DOCUMENT CHANGE MEMO

DCA2018SS-08.pdf

Equal Pay Act
DATE

September 21, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

102.20 Equal Pay Act

DOCUMENT CHANGE MEMO

DCA2018SS-07.pdf

Equal Pay Act
DATE

August 10, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

102.13 Prevailing Wage Rates

DOCUMENT CHANGE MEMO

DCA2018SS-06.pdf

QPL Qualification Criteria Updates
DATE

May 18, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Divisions: 500, 700, 800 and 900

DOCUMENT CHANGE MEMO

DCA2018SS-04.pdf

Cost-Plus Work Forms
DATE

April 6, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix Z

DOCUMENT CHANGE MEMO

DCA2018SS-03

Small Business Enterprise Regulation Update
DATE

April 3, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Advertisement for Proposals, and Appendix X, NJTA Requirements for Small Business Enterprise Subcontractors’ and Set-Aside Program for Construction Contracts

DOCUMENT CHANGE MEMO

DCA2018SS-02.pdf

Appendix X – Compliance Manager Update
DATE

February 15, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix X

DOCUMENT CHANGE MEMO

DCA2018SS-01.pdf

Contractor Prequalification 2017 Regulations
DATE

October 24, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Revisions to Contractor Prequalification Requirements

DOCUMENT CHANGE MEMO

DCA2017CP-01.pdf

Contaminated Soil and Groundwater
DATE

September 13, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

216.02 Site Background. 216.03 Regulatory Requirements. 216.04 Health and Safety Plan. 216.05 Materials Handling Plan. 216.06 Waste Characterization.

DOCUMENT CHANGE MEMO

DCA2017SS-06.pdf

Americans with Disabilities Act
DATE

September 6, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

106.19 Risks Assumed By The Contractor

DOCUMENT CHANGE MEMO

DCA2017SS-05_.pdf

106.20 Insurance
DATE

September 6, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

106.20 Insurance

DOCUMENT CHANGE MEMO

DCA2017SS-04_.pdf

New Issuance of the Standard Specifications
DATE

March 13, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ALL

DOCUMENT CHANGE MEMO

DCA2017SS-03.pdf

Prohibited Activities in Russia and Belarus Update
DATE

February 20, 2004

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 102 Bidding Requirements and Conditions, Subsection 102.09 Submitting Proposals Subsection 102.21 Prohibited Activities in Russia or Belarus

DOCUMENT CHANGE MEMO

DCA2024SS 03

CADD Manual DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

The CADD Standards Manual now reflects utilizing the latest version of MicroStation available. For the file naming template, contract sheet files on page 19 of the Manual now clarifies Change of Plan and Addendum phase nomenclature.
DATE

February 23, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Entire Manual

DOCUMENT CHANGE MEMO

DCA2022-CADD-01

Changes have been made to the Authority's CADD Standards Manual specifically to address the inclusion of updated CSV files for level naming and its associated custom color table. The resource files may be found alongside the manual on the Authorit's website for convenience.
DATE

June 13, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix

DOCUMENT CHANGE MEMO

DCA2013-CADD-02

A supplement document to the CADD Standards Manual, entitled "NJTA Facilities Improvement Program, CADD/BIM Manual," is now included for the direction of all building facility design plan preparation and production. The supplement specifically outlines the 3D design requirements and contract plan extractions for all building facility CADD contract deliverables.
DATE

April 16, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

NJTA Facilities Improvement Program, CADD/BIM Manual

DOCUMENT CHANGE MEMO

DCA2013-CADD-01

The latest version of the CADD Standards Manual was revised. This supersedes the previous Manual and replaces it with the new CADD Standards Manual dated April 12, 2010
DATE

April 12, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Entire Manual

DOCUMENT CHANGE MEMO

DCA2010-CADD-01

Design Manual DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

Structural Live Load and Miscellaneous Updates
DATE

March 27, 2025

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3 Structures Design, Subsection 3.0 Definitions, Subsection 3.2 Bridges

DOCUMENT CHANGE MEMO

DCA2025DM 01

Electrical Qualification Criteria Updates
DATE

January 9, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 8 Lighting and Power Distribution Systems, Subsection 8.1 General Subsection 8.2 Lighting Systems Design Subsection 8.3 Lighting Equipment and Materials Subsection 8.4 Power Distribution and Raceway System Design

DOCUMENT CHANGE MEMO

DCA2024DM 01

Structural and Geotechnical Miscellaneous Updates
DATE

November 3, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3 Structures Design Section 6 Geotechnical Engineering

DOCUMENT CHANGE MEMO

DCA2023DM 02

Precast Concrete Construction Barrier (PCCB) Update
DATE

September 22, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 10 Traffic Control During Construction, Subsection 10.8 Precast Concrete Construction Barrier, Subsection 10.17 Temporary Attenuator Selection and Design Guidelines

DOCUMENT CHANGE MEMO

DCA2023DM 01

Parallel Acceleration Lane
DATE

September 27, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 1 New Jersey Turnpike Geometric Design, Subsection 1.4 Auxiliary Lanes Section 2 Garden State Parkway Geometric Design, Subsection 2.5 Auxiliary Lanes

DOCUMENT CHANGE MEMO

DCA2022DM-04

Geometric, Geotechnical, and Miscellaneous Updates
DATE

July 13, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 1 New Jersey Turnpike Geometric Design, Section 2 Garden State Parkway Geometric Design, Section 6 Geotechnical Engineering

DOCUMENT CHANGE MEMO

DCA2022DM-03

As-Built Load Ratings
DATE

June 13, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 3.2 Bridges

DOCUMENT CHANGE MEMO

DCA2022DM-02

Bridge Plan Checklist
DATE

May 31, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3

DOCUMENT CHANGE MEMO

DCA2022DM-01

Lighting and Power Distribution Systems
DATE

November 23, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 8

DOCUMENT CHANGE MEMO

DCA2021DM-04

Longitudinal Barriers
DATE

August 6, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 4

DOCUMENT CHANGE MEMO

DCA2021DM-03

Stormwater Management
DATE

July 8, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

section 5

DOCUMENT CHANGE MEMO

DCA2021DM-02

Section 3 Structures Design, Subsection 3.3.4 Proprietary Wall Design Guidelines
DATE

March 18, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

dca2021dm-01.pdf

DOCUMENT CHANGE MEMO

DCA2021DM-01

UPDATED DESIGN MANUAL FORMAT
DATE

February 7, 2020

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Single file document

DOCUMENT CHANGE MEMO

DCA2020DM-01

BRIDGE AND STRUCTURES
DATE

January 31, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

section 2 structures design

DOCUMENT CHANGE MEMO

DCA2019DM-01

GEOTECHNICAL DESIGN
DATE

December 21, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 5

DOCUMENT CHANGE MEMO

DCA2017DM-03

CONTAMINATED SOIL AND GROUNDWATER
DATE

September 13, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Sections 12.1, 12.2, 12.3, 12.4, & 12.5

DOCUMENT CHANGE MEMO

DCA2017DM-02

TRAFFIC CONTROL IN WORK ZONES
DATE

May 17, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Sections 9.4 & 9.11

DOCUMENT CHANGE MEMO

DCA2017DM-01

GROUND MOUNTED SIGNS
DATE

December 5, 2016

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 2.5

DOCUMENT CHANGE MEMO

DCA2016DM-01

REMOVED LANGUAGE IN SECTIONS 6.4.2 AND 6.4.2.1 OF THE DESIGN MANUAL RELATING TO ENHANCED INTEGER MILE MARKERS ON THE TURNPIKE.
DATE

January 6, 2015

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 6.4.2 and 6.4.2.1

DOCUMENT CHANGE MEMO

DCA2015-DM-01

DESIGN MANUAL LANGUAGE IS TO BE CHANGED TO COINCIDE WITH NEW STANDARD DRAWINGS AND STANDARD SPECIFICATIONS. REVISIONS ARE MADE TO SUBSECTIONS 2.2.4.3.1 AND 2.2.4.3.2 ADDITIONAL CHANGE IS MADE TO ACCOUNT FOR THERMAL MOVEMENT OF SKEWED AND CURVED BRIDGES.
DATE

December 3, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 2.2.4.3

DOCUMENT CHANGE MEMO

DCA2014-DM-05

THE TRAFFIC CONTROL FOR THE BOTH ROADWAYS HAS BECOME SIMILAR. REVISIONS TO SECTION 9, 9.1, INTRODUCTION AND LANE AND ROADWAY CLOSURES SECTION 9.7.1, LANE CLOSINGS. NEW STANDARD DRAWINGS FOR MOBILE LANE CLOSINGS HAS BEEN ADDED AS A REFERENCE.
DATE

June 13, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 9

DOCUMENT CHANGE MEMO

DCA2014-DM-03

THIS CHANGE REVISES SUBMITTAL REQUIREMENTS PERTAINING TO TRAFFIC CONTROL ON LOCAL ROADWAYS THAT REQUIRE NJDOT REVIEW AND INVOLVEMENT IN ADDITION TO LOCAL COUNTY AND/OR MUNICIPALITY RESOLUTIONS ESTABLISHING INSTALLATION OR MODIFICATION OF A TRAFFIC CONTROL DEVICE OR ESTABLISHING A TRAFFIC REGULATION. TRAFFIC CONTROL IS SPECIFIC TO LOCAL ROAD DETOURS EXCEEDING 48 HOURS AND TRAFFIC CONTROL AFFECTING STATE HIGHWAYS.
DATE

March 11, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 1.A.5 and 1.B.6

DOCUMENT CHANGE MEMO

DCA2014_DM_02

UPDATES TO THE DESIGN MANUAL ARE NECESSARY TO INCORPORATE A SAMPLE STORMWATER MAINTENANCE PLAN AND TO CLARIFY THE SUBMISSION REQUIREMENTS.
DATE

March 5, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 4

DOCUMENT CHANGE MEMO

DCA2014_DM_01

REPLACE SECTIONS 6A AND 6B WITH COMBINED SECTION 6 (SIGNING AND STRIPPING), INCLUDING REVISED POLICIES, PRACTICES AND STANDARDS FOR BOTH THE TURNPIKE AND PARKWAY.
DATE

January 17, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 06

DOCUMENT CHANGE MEMO

DCA2013-DM-02

CHANGES TO THE ENVIRONMENTAL ENGINEERING SECTION OF THE DESIGN MANUAL ARE BEING IMPLEMENTED TO CLARIFY THE RESPONSIBILITIES OF THE DESIGN CONSULTANT RELATIVE TO ENVIRONMENTAL INVESTIGATIONS INCLUDING THAT OF THE LICENSED SITE REMEDIATION PROFESSIONAL.
DATE

January 10, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 12

DOCUMENT CHANGE MEMO

DCA2013-DM-01

SECTION 2.2.6 HAS BEEN REVISED TO CLARIFY INTENT OF REHABILITATION DESIGN, MORE CLEARLY DEFINE ACCEPTABLE LEVELS OF DAMAGE ENCOUNTERED IN A SEISMIC EVENT, AND TO REVISE THE DEFINITIONS FOR ESSENTIAL AND CRITICAL BRIDGES TO MORE CLOSELY COINCIDE WITH FHWA AND AASHTO DESIGN MANUALS.
DATE

November 14, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 2.2.6

DOCUMENT CHANGE MEMO

DCA2012-DM-05

DEFLECTION DESIGN CRITERIA UPDATED TO BETTER REFLECT AASHTO INTENT AND DISCONNECT LIVE LOAD MODEL USAGE FROM RECENTLY REVISED AND INCREASED DESIGN LIVE LOADS.
DATE

August 15, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.2

DOCUMENT CHANGE MEMO

DCA2012-DM-03

INCREASED WEIGHT OF TRUCK TRAFFIC ON THE TURNPIKE MAINLINE AND RAMPS HAS BEEN IDENTIFIED AS GREATLY EXCEEDING CURRENT AASHTO MINIMUM DESIGN CRITERIA VIA WEIGH IN MOTION STUDIES. THIS REVISION INCREASES THE LIVE LOAD FOR THE TURNPIKE MAINLINE AND RAMP STRUCTURES ONLY IN ORDER TO PREVENT UNDER DESIGNED BRIDGES. THE DESIGN LIVE LOAD FOR THE PARKWAY REMAINS UNCHANGED.
DATE

August 15, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.2

DOCUMENT CHANGE MEMO

DCA2012-DM-04

CHANGES HAVE BEEN MADE REGARDING THE SPECIFICATION AND DESIGN OF ANCHOR BOLTS AND HORIZONTAL FORCES.
DATE

April 4, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.4.3.2

DOCUMENT CHANGE MEMO

DCA2012-DM-02

CHANGES HAVE BEEN MADE TO INTRODUCE THE NJTA LOAD RATING MANUAL TO DESIGN ENGINEERS AND STIPULATE ITS USAGE FOR NEW AND REHABILITATION BRIDGE DESIGN PROJECTS. THIS REVISION ALSO CLARIFIES THE LOAD RATING ANALYSIS AND RESULTS WHICH SHALL BE INCLUDED IN THE PHASE C SUBMISSION.
DATE

January 25, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.1.2 and 2.2.7

DOCUMENT CHANGE MEMO

DCA2012-DM-01

THIS CHANGE PROVIDES MORE FREEDOM TO THE DESIGN ENGINEER REGARDING SUPERSTRUCTURE DESIGN IN CERTAIN SITUATIONS RESULTING IN MORE ECONOMICAL DESIGNS
DATE

November 17, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 2.2.4.1.1a

DOCUMENT CHANGE MEMO

DCA2011-DM-13

CLARIFIES THAT CLASS P CONCRETE SHALL BE USED FOR ALL PRECAST ELEMENTS.
DATE

November 9, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.3.2 and 2.7.8

DOCUMENT CHANGE MEMO

DCA2011-DM-08

REPLACES CORRUGATED METAL PIPE (CMP) WITH HIGH DENSITY POLYETHYLENE PIPE (HDPE) FOR UNDERDRAIN PIPE DUE TO CORROSION ISSUES WITH CMP. ALSO ELIMINATES AN INCORRECT CALLOUT AT THE APPROACH SLAB THAT CONFLICTS WITH STANDARD DRAWING BR-6.
DATE

November 9, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Exhibit 2-201

DOCUMENT CHANGE MEMO

DCA2011-DM-09

REPLACES CORRUGATED METAL PIPE (CMP) WITH HIGH DENSITY POLYETHYLENE PIPE (HDPE) FOR UNDERDRAIN PIPE DUE TO CORROSION ISSUES WITH CMP.
DATE

November 9, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.3.6d, Exhibit 2-203 & Exhibit 2-204

DOCUMENT CHANGE MEMO

DCA2011-DM-10

CLARIFIES THAT THE PILE SLEEVE SHOWN IS REQUIRED AS PER DESIGN ONLY.
DATE

November 9, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Exhibit 2-205

DOCUMENT CHANGE MEMO

DCA2011-DM-11

DESIGN STANDARD MINIMUMS HAVE BEEN UPDATED FOR BRIDGE MOUNTED LIGHTING TO MITIGATE FATIGUE ISSUES IN WELDED ALUMINUM LIGHT STANDARDS. LIGHT STANDARD VENDORS MUST NOW EXAMINE FATIGUE ISSUES RELATED TO BRIDGE MOUNTED STRUCTURES PRIOR TO BEING PERMITTED TO BID FABRICATION OF THESE ITEMS.
DATE

November 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.6

DOCUMENT CHANGE MEMO

DCA2011-DM-07

PROVIDES DIRECTION TO THE DESIGN ENGINEER REGARDING PIER COLUMN REINFORCEMENT DETAILING BEYOND THE AASHTO LRFD CODE.
DATE

November 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 2.2.2

DOCUMENT CHANGE MEMO

DCA2011-DM-12

THIS DCA PROVIDES GUIDANCE FOR THE USE OF EXHIBIT 3-4.
DATE

November 3, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3, Subsection 3.2.2

DOCUMENT CHANGE MEMO

DCA2011-DM-06

THIS DCA IS ESSENTIALLY A RELOCATION OF SECTION 2.2.4.1.11 FROM “SUPERSTRUCTURE DESIGN” TO “MODIFICATIONS TO CURRENT CODES” SO IT IS MORE CLEAR THAT THE DESIRED THERMAL EFFECTS ARE TO BE APPLIED FOR ALL ASPECTS OF BRIDGE DESIGN.
DATE

June 29, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.2.3.10

DOCUMENT CHANGE MEMO

DCA2011-DM-05

TO CLARIFY HOW THE IMPACT LOAD FROM THE BARRIER PARAPET IS TO BE APPLIED TO THE PROPRIETARY RETAINING WALL.
DATE

June 22, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.3.2.6

DOCUMENT CHANGE MEMO

DCA2011-DM-04

OUTDATED LANGUAGE REGARDING THE SELECTION OF BRIDGE BEARINGS HAS BEEN DELETED AND ADDITIONAL LANGUAGE HAS BEEN ADDED TO GUIDE THE DESIGNERS IN SELECTION OF BEARINGS FOR NEW AND RETROFITTED BRIDGES.
DATE

June 21, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.2.4.3.2

DOCUMENT CHANGE MEMO

DCA2011-DM-03

SECTION 2.5 AND VARIOUS EXHIBITS IN THE STRUCTURES DESIGN SECTION PERTAINING TO TURNPIKE AND PARKWAY OVERHEAD AND CANTILEVER SIGN STRUCTURES REQUIRE REVISION TO COMPLY WITH THE NEW GARDEN STATE PARKWAY SIGN STRUCTURE STANDARD DRAWINGS SI-35, SI-39, SI-40 AND SI-41. THE AFFECTED EXHIBITS ARE 2-404, 2-405, 2-408, 2-409, 2-410, 2-411 AND 2-412.
DATE

April 5, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 2.5 and Series 400 Exhibits

DOCUMENT CHANGE MEMO

DCA2011-DM-02

TO REVISE THE EXHIBITS TO CONFORM WITH THE RECENT DESIGN MANUAL AND SPECIFICATION UPDATES FOR THE DESIGN OF ALTERNATE RETAINING WALLS, PREFABRICATED MODULAR WALLS AND MECHANICALLY STABILIZED EMBANKMENT WALLS ON NJTA PROJECTS.
DATE

January 14, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Series 500 Exhibits

DOCUMENT CHANGE MEMO

DCA2011-DM-01

TO IDENTIFY AND UPDATE CONSIDERATIONS AND REQUIREMENTS FOR DESIGN OF ALTERNATE RETAINING WALLS, PREFABRICATED MODULAR WALLS AND MECHANICALLY STABILIZED EMBANKMENT WALLS FOR NJTA PROJECTS.
DATE

December 8, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.3.2

DOCUMENT CHANGE MEMO

DCA2010-DM-23

THE ERRONEOUS REQUIREMENT THAT THE REINFORCEMENT SUPPORT BARS BE GALVANIZED HAS BEEN DELETED.
DATE

November 9, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2-303

DOCUMENT CHANGE MEMO

DCA2010-DM-22

CHANGES HAVE BEEN MADE TO CLARIFY THAT THE MODIFICATION TO THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS REGARDING LIVE LOADS ARE NOT TO BE APPLIED TO MODULAR JOINT DESIGN.
DATE

November 5, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.2

DOCUMENT CHANGE MEMO

DCA2010-DM-18

TO CORRECT AN ERRONEOUS EXHIBIT DETAIL REFERENCE.
DATE

November 5, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.5.2.5a

DOCUMENT CHANGE MEMO

DCA2010-DM-19

TO UPDATE LANGUAGE TO ASSURE THAT CURRENT PARAMETERS WILL DEFINE THE ECONOMY OF STEEL FABRICATIONS. THIS RULE OF THUMB FOR THE 50% RULE FOR FLANGE PLATE TRANSITIONS IS PROVIDED BY THE NATIONAL STEEL BRIDGE ALLIANCE (NSBA). THE CURRENT DESIGN MANUAL LANGUAGE IS OVERLY RESTRICTIVE.
DATE

November 5, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.4.1(10)

DOCUMENT CHANGE MEMO

DCA2010-DM-20

CHANGES HAVE BEEN MADE TO DELETE THE ALLOWANCE FOR A FUTURE WEARING SURFACE ON BARE CONCRETE DECK BRIDGES
DATE

November 5, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.2 and 2.2.4.2(1a)

DOCUMENT CHANGE MEMO

DCA2010-DM-21

DESIGN MANUAL SECTION 4 HAS BEEN REVISED TO INCLUDE HIGH DENSITY POLYETHYLENE PIPE (HDPE) AND DUCTILE IRON PIPE, TO ELIMINATE THE USE OF CORRUGATED ALUMINUM/STEEL PIPE, TO REVISE INLET DESIGNATIONS OF D-INLETS AND G-GRATES AND TO REVISE DESIGNATION OF “STREAM ENCROACHMENT” TO “FLOOD HAZARD AREA”.
DATE

September 30, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

4

DOCUMENT CHANGE MEMO

DCA2010-DM-17

DELETION OF THE FIRST PARAGRAPH OF SECTION 2.2.1.2 AND THE LAST PARAGRAPH OF SECTION 2.2.2 THAT WERE INADVERTENTLY NOT DELETED AS PART OF DCA2010-DM-07
DATE

September 27, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.1.2 and 2.2.2

DOCUMENT CHANGE MEMO

DCA2010-DM-16

SEISMIC DESIGN CRITERIA FOR NJTA OWNED BRIDGES HAS BEEN REVISED TO ACCOMMODATE RECENTLY INTRODUCED CHANGES TO THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS AND ITS COMPANION SEISMIC DESIGN GUIDE SPECIFICATIONS
DATE

September 9, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.6

DOCUMENT CHANGE MEMO

DCA2010-DM-14

SEISMIC DESIGN CRITERIA FOR NOISE BARRIERS HAS BEEN REVISED TO ACCOMMODATE RECENTLY INTRODUCED CHANGES TO THE AASHOT LRFD BRIDGE DESIGN SPECIFICATIONS AND ITS COMPANION SEISMIC DESIGN GUIDE SPECIFICATIONS
DATE

September 9, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.7.3

DOCUMENT CHANGE MEMO

DCA2010-DM-15

SECTIONS 1A, 1B, AND 3 HAVE BEEN REVISED TO ACCOMMODATE CURRENT DESIGN STANDARDS/TRENDS AND ADDRESS CONSISTENCY WITH RECENTLY UPDATED STANDARD DRAWINGS AND DETAILS.
DATE

August 30, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

1A, 1B, and 3

DOCUMENT CHANGE MEMO

DCA2010-DM-13

LANGUAGE HAS BEEN ADDED TO PROVIDE GUIDANCE TO THE DESIGN ENGINEERS REGARDING SHOULDER WIDTHS ON NJTA AND GSP ROADWAYS.
DATE

August 20, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.1

DOCUMENT CHANGE MEMO

DCA2010-DM-12

LANGUAGE HAS BEEN ADDED TO DIRECT DESIGN ENGINEERS WHEN AND WHERE CONDUIT SHALL BE PLACED IN PARAPETS ON NEW JERSEY TURNPIKE AUTHORITY STRUCTURES.
DATE

July 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

7.4.4.2

DOCUMENT CHANGE MEMO

DCA2010-DM-08

CHANGES HAVE BEEN MADE TO INCLUDE A REVISION TO THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS REGARDING VEHICLE AND RAILWAY COLLISIONS WITH STRUCTURES.
DATE

July 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.2

DOCUMENT CHANGE MEMO

DCA2010-DM-09

REVISED THE LANGUAGE UNDER MAINTENANCE CONSIDERATIONS TO UPDATE AND CLARIFY DESIGN LAYOUT GUIDANCE FOR ACCESS TO AREAS BETWEEN NOISE BARRIERS AND RIGHT-OF WAY LINES FOR INSPECTION, REPAIRS, MAINTENANCE, ETC. BASED ON COMMENTS RECEIVED FROM NJTA MAINTENANCE DEPARTMENT ON WIDENING PROGRAM DESIGN SUBMISSIONS.
DATE

July 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.7.5(3)

DOCUMENT CHANGE MEMO

DCA2010-DM-10

TO INCLUDE PROVISIONS FOR DESIGN OF END DIAPHRAGMS TO ACCOMMODATE SERVICE CONDITIONS AND FUTURE USE AS JACKING POINTS FOR BEARING REPLACEMENTS WHERE JACKING COULD BE PERFORMED UNDER TRAFFIC. TO INCLUDE ACCESS TO THE PORTIONS OF STEELWORK, GIRDERS AND END DIAPHRAGMS FOR INSPECTION, MAINTENANCE, REPAIRS, JACKING AND FUTURE CLEANING AND PAINTING.
DATE

July 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.4.1(7)

DOCUMENT CHANGE MEMO

DCA2010-DM-11

CHANGES HAVE BEEN MADE TO INTRODUCE THE LRFR MANUAL TO DESIGN ENGINEERS AND STIPULATE ITS USAGE FOR NEW AND REHABILITATION BRIDGE DESIGN PROJECTS, THIS REVISION ALSO STIPULATE THE DELIVERABLES REQUIRED TO BE SUBMITTED AS PART OF THE PHASE C SUBMISSION.
DATE

July 20, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.1 and 2.2.2

DOCUMENT CHANGE MEMO

DCA2010-DM-07

INCLUDED LANGUAGE PROVIDING DESIGN ENGINEERS WITH GUIDANCE FOR THE DESIGN SPEED TO BE USED FOR THE DESIGN OF TEMPORARY IMPACT ATTENUATORS AS MUTCD AND AASHTO ROADSIDE DESIGN GUIDE DO NOT PROVIDE ANY RECOMMENDATIONS.
DATE

July 19, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

9.17.12.1

DOCUMENT CHANGE MEMO

DCA2010-DM-04

A NEW SUBSECTION HAS BEEN ADDED PROVIDING GUIDANCE TO THE DESIGN ENGINEERS REGARDING DIFFERENT ASPECTS TO BE CONSIDERED DURING THE DESIGN PHASE WHEN TRAFFIC SHIFTS ARE REQUIRED.
DATE

July 19, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

9.7.6

DOCUMENT CHANGE MEMO

DCA2010-DM-05

ALLOWED THE USE OF CLASS A CONCRETE WITH CONCRETE PENETRATING SEALER IN SITUATIONS WHERE ONLY A SMALL QUANTITY IS REQUIRED IT IS COST PROHIBITIVE OR UNNECESSARY TO USE HPC.
DATE

July 19, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.3.2

DOCUMENT CHANGE MEMO

DCA2010-DM-06

NEW SUBSECTION 11 ADDED TO SUBPART 2.2.4.1. CLAIRIFICATION PROVIDED TO THE DESIGN ENGINEERS REGARDING THE DESIGN OF THERMAL MOVEMENTS FOR DECK JOINTS. GUIDENANCE IS ALOS PROVIDED AS TO THE JOINT TYPE, EITHER STRIP SEAL OR MODULAR, TO BE USED ON MAXIMUM MOVEMENT RATINGS.
DATE

July 13, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.4.1

DOCUMENT CHANGE MEMO

DCA2010-DM-03

CLARIFICATION ON THE CONCRETE CLASSES USED FOR DIFFERENT ELEMENTS OF NOISE BARRIER CONSTRUCTION
DATE

June 16, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.7.8.1

DOCUMENT CHANGE MEMO

DCA2010-DM-01

REVISION TO PRECLUDE THE USE OF CANTILEVERED SECTIONS OF ABUTMENT WINGWALLS ("ELEPHANT EARS") TO ELIMINATE FUTURE SETTLEMENT OF ADJACENT APPROCH SHOULDERS DUE TO POOR COMPACTION OF SOILS BELOW THE CANTILEVERED SECTION.
DATE

June 16, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.5.2(1)

DOCUMENT CHANGE MEMO

DCA2010-DM-02

CREATION OF NEW SECTION FOR DESIGN MANUAL, SECTION 12 ENTITLED ENVIRONMENTAL ENGINEERING
DATE

September 2, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

12

DOCUMENT CHANGE MEMO

DCA2009-DM-04

REVISIONS MADE TO THE JOINT CLASS REQUIRED FOR PRECAST CONCRETE CONSTRUCTION BARRIER USED AS A BRIDGE PARAPET.
DATE

July 30, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

9.8.3

DOCUMENT CHANGE MEMO

DCA2009-DM-03

REPLACING ENTIRE SECTION
DATE

June 3, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2

DOCUMENT CHANGE MEMO

DCA2009-DM-2 Section 2

REINFORCEMENT STEEL
DATE

April 7, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.3.3

DOCUMENT CHANGE MEMO

DCA2009-DM-01

Revised Page 2-8

REVISION OF GARDEN STATE PARKWAY PAVEMENT SECTION EXHIBITS 1B-13, 1B-14 AND 1B-15
DATE

November 21, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

1 B.3.2– Exhibits 1B-13, 1B-14 and 1B-15

ADDITIONAL DESIGN STRUCTURAL SOFTWARE
DATE

October 15, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.7.2

DOCUMENT CHANGE MEMO

DCA2008-DM-4 Memo

Pages 2-31 & 2-32

ADDITIONAL GUIDANCE PROVIDED FOR THE SELECTION OF CANTILEVERED OR NON-CANTILEVERED PIERS
DATE

August 25, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.5.1

DOCUMENT CHANGE MEMO

DCA2008-DM-01-Piers-memo

Page 2-22

CONSTRUCTION OF LONGITUDINAL JOINTS FOR WIDE STRUCTURES
DATE

August 25, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.4.2(1)

DOCUMENT CHANGE MEMO

DCA2008-DM-02-memo

Page 2-11

REVISED EXHIBIT 2-214 FOR GENERAL GUIDELINES ON TURNPIKE PIER DETAILS
DATE

August 25, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2-214

DOCUMENT CHANGE MEMO

DCA2008-DM-01-Piers-memo

Page 2-95

GUIDANCE PROVIDED FOR THE USE OF INTEGRAL ABUTMENTS ON BRIDGES
DATE

August 25, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.5.2(5)

DOCUMENT CHANGE MEMO

DCA2008-DM-3 Memo

Page 2-23

REVISED EXHIBIT 2-200 ABUTMENT PLANS
DATE

August 25, 2008

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2-200

DOCUMENT CHANGE MEMO

DCA2008-DM-3 Memo

Page 2-81

REVISED LANGUAGE IN THE FIRST AND FIFTH PARAGRAPHS OF THIS SECTION FOR SPAN-TYPE SIGN STRUCTURES
DATE

December 21, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.5.1.2.a

DOCUMENT CHANGE MEMO

DCA2007-DM-4

DESIGN REQUIREMENT FOR SEISMIC EVALUATIONS IS REVISED TO REFLECT CURRENT NEHRP (2003) PROVISIONS
DATE

December 18, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.6.3

DOCUMENT CHANGE MEMO

DCA2007-DM-1

REVISED EXHIBIT 1A-23 TO INCLUDE ABSOLUTE MINIMUM VALUES FOR RAMP LANE WIDTHS
DATE

December 18, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

1A.3.4

DOCUMENT CHANGE MEMO

DCA2007-DM-2

CORRECTION OF TYPOGRAPHICAL ERROR IN THE SHOULDER WIDTHS OF EXHIBITS 2-108 AND 2-100
DATE

December 5, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Exhibits 2-108 and 2-110

DOCUMENT CHANGE MEMO

DCA2007-DM-3

REVISED 3RD SKETCH IN EXHIBIT 1A-40, U-TURN STRUCTURAL SECTION
DATE

August 2, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

1A.5.3

DOCUMENT CHANGE MEMO

N/A

ADDED PARAGRAPH UNDER “THE EXTREME EVENT LIMIT STATES – DIRECTION” TO PROVIDE LOAD RATINGS FOR NEW BRIDGES AS REQUIRED BY THE NBIS FOR STRUCTURAL INVENTORY AND APPRAISAL (SI&A) DATABASE
DATE

August 2, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

2.2.1

DOCUMENT CHANGE MEMO

N/A

ISSUANCE OF DESIGN MANUAL
DATE

June 6, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

All

DOCUMENT CHANGE MEMO

N/A

REVISED 3RD PARAGRAPH OF SUBSECTION DIRECTION ON REPLACING EXISTING INLETS WITH ECO GRATE OR CURB PIECE
DATE

June 1, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

4.7.5

DOCUMENT CHANGE MEMO

N/A

Procedures Manual DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

Gas Pipelines Update
DATE

December 31, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 8 Utility Installations, Relocations and Adjustments, Subsection 8.2 Utility Orientation and Construction Policy

DOCUMENT CHANGE MEMO

DCA2024PM 02

Submission Requirements
DATE

October 31, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3 Submission Requirements Section 11 Constructability Review

DOCUMENT CHANGE MEMO

DCA2024PM 01

Right of Way (ROW) Update
DATE

February 17, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 9 - Right-of-Way

DOCUMENT CHANGE MEMO

DCA2023PM-01

Geometric, Geotechnical, and Miscellaneous Updates
DATE

July 13, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 5 Geotechnical Engineering, Subsection 5.1 Introduction, Subsection 5.2 Preliminary Design Subsection 5.3 Phase A Subsection 5.4 Phase B Subsection 5.5 Phase C Subsection 5.6 Phase D Subsection 5.7 Contract Documents for Bids and Post-Design Services

DOCUMENT CHANGE MEMO

DCA2022PM-01

UPDATED PROCEDURES MANUAL FORMAT
DATE

August 7, 2019

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ALL

DOCUMENT CHANGE MEMO

DCA2019PM-01

CONSTRUCTABILITY REPORT
DATE

March 9, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

3.5

DOCUMENT CHANGE MEMO

DCA2018PM-01

CONTAMINATED SOIL AND GROUNDWATER
DATE

September 13, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

5.2 Geotechnical Investigation

DOCUMENT CHANGE MEMO

DCA2017PM-03

ISSUANCE OF THE 2016 STANDARD SPECIFICATIONS
DATE

March 13, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Sections 3, 9, & 10

DOCUMENT CHANGE MEMO

DCA2017PM-01

UNDER SUBMISSION REQUIREMENT SECTION 3.4.6.5 (AS-BUILT PLANS): REWORD 1. AS FOLLOWS: "1. ONE (1) SET OF FINAL AS-BUILT MYLAR DRAWINGS SIZED AT 22"X36" AND SHALL CONTAIN THE FOLLOWING."
DATE

August 4, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.6.5

DOCUMENT CHANGE MEMO

DCA2014-PM-04

THIS CHANGE REVISES SUBMITTAL REQUIREMENTS PERTAINING TO TRAFFIC CONTROL ON LOCAL ROADWAYS THAT REQUIRE NJDOT REVIEW AND INVOLVEMENT IN ADDITION TO LOCAL COUNTY AND/OR MUNICIPALITY RESOLUTIONS ESTABLISHING INSTALLATION OR MODIFICATION OF A TRAFFIC CONTROL DEVICE OR ESTABLISHING A TRAFFIC REGULATION. TRAFFIC CONTROL IS SPECIFIC TO LOCAL ROAD DETOURS EXCEEDING FORTY-EIGHT (48) HOURS AND TRAFFIC CONTROL AFFECTING STATE HIGHWAYS.
DATE

March 11, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.3, 3.4.4, 3.4.5, 6A.5.8 and 6A.6

DOCUMENT CHANGE MEMO

DCA2014-PM-03

ADD CERTIFICATION STATEMENT AFTER LAST SENTENCE ON 1.0B.0 AS FOLLOWS: THE RESIDENT ENGINEER'S CERTIFICATION STAMP SHALL STATE: "I CERTIFY THAT TO THE BEST OF MY KNOWLEDGE THIS CONTRACT HAS BEEN CONSTRUCTED IN CONFORMITY WITH THE ORIGINAL PLANS, SPECIFICATIONS AND MODIFICATIONS, AS IDENTIFIED HEREIN AS-BUILT."
DATE

February 10, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.6.5

DOCUMENT CHANGE MEMO

DCA2014-PM-02

ADDING MORE DETAILED AND SPECIFIC INSTRUCTION IN SECTION 3 OF PROCEDURES MANUAL, SUBMISSION REQUIREMENTS FOR AS-BUILTS IN SECTION 3.4.6.5.
DATE

January 23, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.6.5

DOCUMENT CHANGE MEMO

DCA2014-PM-01

THESE UPDATES TO THE PROCEDURES MANUAL ARE NECESSARY IN ORDER TO STANDARDIZE THE SUBMISSION OF REFERENCE DRAWINGS AND/OR MATERIAL THAT ARE TO BE MADE AVAILABLE TO PLAN HOLDERS AT THE TIME OF ADVERTISEMENT. THE FORMAT OF THESE SUBMISSIONS HAS THUS FAR BEEN INCONSISTENT, WHICH HAS LED TO DELAYS CLOSE TO ADVERTISEMENT. THESE PROPOSED GUIDELINES ARE IN-LINE WITH THE RECENT CHANGES TO SPECIFICATION SUBSECTION 102.04 VIA DCA2013SS-07, WHICH ALLOWS FOR PUBLISHING OF REFERENCE MATERIAL TO EITHER BIDX OR THE SECURE FTP WEBSITE.
DATE

November 8, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.5

DOCUMENT CHANGE MEMO

DCA2013-PM-05

ADDITIONAL PARAGRAPH ADDED TO SECTION 7.2.4 TO PROPERLY REFLECT THE AVAILABILITY OF THE COMPLETED UTILITY PERMIT DATABASE, AS WELL AS TO INFORM THE CONSULTANT OF THEIR RESPONSIBILITY TO FOLLOW THE AGREEMENTS BETWEEN THE OWNER(S) OF THE UTILITY AND THE AUTHORITY ON REGARD TO FACILITY RELOCATION.
DATE

July 24, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 7.2.4

DOCUMENT CHANGE MEMO

DCA2013-PM-04

TO EMPHASIZE THE NEEDS OF THE CADD AND CONTRACTS SECTIONS AND PROVIDE CLEARER DIRECTION TO DESIGN CONSULTANTS, THESE UPDATES TO THE PROCEDURES MANUAL CLARIFY DELIVERABLE REQUIREMENTS FOR THE PHASE D SUBMISSION AND CHANGE OF PLANS PROCEDURE. SPECIFICALLY, THE REQUIRED FILE TYPES OF ELECTRONIC SUBMISSIONS ARE ADDRESSED, AND INSTRUCTIONS ON NEW PAY ITEMS VIA CHANGE OF PLANS ARE PROVIDED.
DATE

April 10, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.5 and 9.3

DOCUMENT CHANGE MEMO

DCA2013-PM-03

CORRECTION OF A TYPOGRAPHICAL ERROR ON PAGE 7-23
DATE

April 9, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 7

DOCUMENT CHANGE MEMO

DCA2013-PM-02

THESE UPDATES TO THE PROCEDURES MANUAL ARE RELATED TO THE IMPLEMENTATION OF THE ENGINEERING DEPARTMENT'S NEW FULLY-ELECTRONIC BIDDING PROGRAM, BIDX. THE UPDATES AFFECT DESIGN CONSULTANT' PHASE D AND ADDENDA SUBMISSIONS, AS DESCRIBED IN SECTIONS 3, 9, & 10.
DATE

January 18, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.5, 9.2, and 10.2

DOCUMENT CHANGE MEMO

DCA2013-PM-01

MODIFICATIONS TO SECTION 3.4.6.3 – SHOP DRAWING REVIEW TO CLARIFY SHOP AND WORKING DRAWING REVIEW SCOPE AND WORK ROLES OF THE DESIGN ENGINEER AND CONSTRUCTION MANAGER
DATE

June 20, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.6.3

DOCUMENT CHANGE MEMO

DCA2012-PM-04

SECTION 7 – UTILITY INSTALLATIONS, RELOCATIONS AND ADJUSTMENTS
DATE

March 30, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 7

DOCUMENT CHANGE MEMO

DCA2012-PM-03

MODIFICATIONS TO PHASE SUBMISSION REQUIREMENTS
DATE

February 24, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.3, 3.4.4.2 and Exhibits 3-2, 3-3 and 3-4

DOCUMENT CHANGE MEMO

DCA2012-PM-01

MODIFICATIONS TO PHASE SUBMISSION REQUIREMENTS.
DATE

November 30, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.43, 3.4.4.2, 3.4.5 and Exhibits 3-2, 3-3 and 3-4

DOCUMENT CHANGE MEMO

DCA2011-PM-07

CHANGES CLARIFY SUBMISSION REQUIREMENTS FOR STANDARD AND NON-STANDARD BRIDGE BEARINGS.
DATE

November 18, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 3.4.3.18, 3.4.4.1.7, 3.4.4.1.8, 6B5.2 & Exhibits 3-2 and 3-3

DOCUMENT CHANGE MEMO

DCA2011-PM-06

ITEM “O.” WAS ADDED TO THE PHASE C SUBMISSION CHECKLIST AS REQUIRED BY THE RECENT DESIGN MANUAL UPDATE.
DATE

November 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Exhibit 3-3

DOCUMENT CHANGE MEMO

NJTA-DCA2011-PM-05

REQUIRE CONSULTANTS TO SUBMIT CD LABELED “DRAFT” FOR PHASE C SUBMISSIONS, AND “FINAL” FOR PHASE D SUBMISSIONS WITH THE LIST OF REFERENCE DOCUMENTS AND ELECTRONIC FILES OF ALL REPORTS, AS-BUILTS, CONTRACT DRAWINGS, PERMITS AND ANY OTHER INFORMATION IN ORDER TO HAVE DOCUMENTS AVAILABLE DURING ADVERTISEMENT AS INDICATED IN THE SUPPLEMENTARY SPECIFICATION SECTION 107.11
DATE

March 31, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3, Subsections 3.4.4.2 & 3.4.5

DOCUMENT CHANGE MEMO

DCA2011-PM-04

REVISIONS ARE REQUIRED TO UPDATE PROCEDURAL REQUIREMENTS FOR DESIGN OF ALTERNATE RETAINING WALLS, PREFABRICATED MODULAR WALLS AND MECHANICALLY STABILIZED EMBANKMENT WALLS, FOR NJTA PROJECTS DUE TO REVISIONS TO THE NJTA DESIGN MANUAL. THE PROCEDURES IDENTIFY GEOTECHNICAL TESTING AND PLANNING REQUIREMENTS TO ASSURE ADEQUATE ASSESSMENT AND IMPLEMENTATION OF ALTERNATE WALLS.
DATE

March 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 5.2.2.1.1.c, 5.2.2.1.5, and 5.2.3.6.3c(iv)

DOCUMENT CHANGE MEMO

DCA2011-PM-02

TO UPDATE PROCEDURAL REQUIREMENTS FOR DESIGN OF ALTERNATE RETAINING WALLS, PREFABRICATED MODULAR WALLS AND MECHANICALLY STABILIZED EMBANKMENT WALLS, FOR NJTA PROJECTS. THE PROCEDURES IDENTIFY PHASE SUBMISSION REQUIREMENTS TO ASSURE ADEQUATE ASSESSMENT AND IMPLEMENTATION OF ALTERNATE WALLS.
DATE

March 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 6B.3.5, 6B.5.1, and 6B.5.2

DOCUMENT CHANGE MEMO

DCA2011-PM-03

DUE TO LEGAL STANDPOINT, “SUBCONSULTANT SIGNATURE” BOX MUST BE RESTORED AS REQUIRED FOR EXHIBIT 6A-1, TYPICAL SHEET LAYOUT AND EXHIBIT 6A-2, TYPCIAL TITLE BOX
DATE

January 4, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 6A

DOCUMENT CHANGE MEMO

DCA2011-PM-01

EXHIBIT 6A-1, TYPICAL SHEET LAYOUT: DELETE AND REPLACE SHEET LAYOUT TO MATCH OUR FILES WITH “NJTA CADD SUPPORT” LINK AND IN-HOUSE SHEET LAYOUT. EXHIBIT 6A-2, TYPICAL TITLE BOX: DELETE SUB-CONSULTANT SIGNATURE BOX AND REVISE TITLE BOX TO MATCH THE TITLE BOX FOR “NJTA CADD SUPPORT” LINK AND IN-HOUSE PLAN SHEET. 6A.5.1 TITLE SHEET, #3 CHANGE “INDEX OF DRAWINGS” TO “INDEX OF SHEETS” TO MATCH THE TITLE SHEETS INFORMATION ON NJTA CADD SUPPORT LINK.
DATE

December 6, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 6A

DOCUMENT CHANGE MEMO

DCA2010-PM-03

REVISION TO SUBSECTION 3.4.4.2 – CHANGES HAVE BEEN MADE TO INTRODUCE THE LRFR MANUAL TO DESIGN ENGINEERS AND STIPULATE ITS USAGE FOR NEW AND REHABILITATION BRIDGE DESIGN PROJECTS, AN ADDITIONAL REQUIREMENT TO SUBMIT LRFR LOAD RATINGS AS PART OF PHASE C SUBMISSION HAS BEEN ADDED TO INFORM THE DESIGN ENGINEER
DATE

July 20, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 3.4.4.2

DOCUMENT CHANGE MEMO

DCA2008-PM-2 Pages 3-12 and 3-13

REVISION TO SUBSECTION 6B.6 – TO PROVIDE THE DESIGN ENGINEERS WITH GUIDANCE AS TO THE MINIMUM REQUIREMENTS FOR A BRIDGE REPAIR CONTRACT PHASE A SUBMISSION
DATE

July 19, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsections 6B.6

SECTION 3 – SUBMISSION REQUIREMENTS, MODIFICATIONS TO SECTION 3.4.2 PHASE “A” SUBMISSION, EXHIBIT 3-1 PHASE “A” CHECKLIST, EXHIBIT 3-2 PHASE “B” CHECKLIST, EXHIBIT 3-3 PRE-PHASE “C” AND PHASE “C” CHECKLIST, AND EXHIBIT 3-7 ENVIRONMENTAL PERMITS
DATE

October 8, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3.4.2, Exhibit 3-1, Exhibit 3-2, Exhibit 3-2, Exhibit 3-3, and Exhibit 3-

SECTION 6A ROADWAY PLAN PREPARATION, SUBSECTION 6A.5.6 ALIGNMENT DATA SHEET; CORRECT ITEM 2 TO READ BEARING, TO NEAREST 0.1 SECOND
DATE

August 18, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 6A.5.6

DOCUMENT CHANGE MEMO

DCA2009-PM-4 Page 6A-8

SECTION 7 CLARIFICATION OF WHEN EXISTING AND PROPOSED UTILITIES WILL BE PERMITTED TO BE CARRIED BY STRUCTURES OVER AUTHORITY ROADWAYS
DATE

July 24, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 7.2.1

DOCUMENT CHANGE MEMO

DCA2009-PM-3 Page 7-2

SECTION 10 REPLACES STANDARD ITEM NUMBERS WITH UNIT CODES IN SECTION 10.1 FINAL ENGINEERS ESTIMATE AND EXHIBIT 10-1 SAMPLE FINAL ENGINEERS ESTIMATE
DATE

June 1, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Section 3 Exhibit 3-1 and Section 3.4.3

DOCUMENT CHANGE MEMO

DCA2009-PM-2 Page 3-7 & 3-9

SECTION 3 - SUBMISSION REQUIREMENTS ADD REFERENCE TO MANUAL FOR UNIT CODES IN SECTION 3.4.3 - PHASE B SUBMISSION ITEM 13 AND EXHIBIT 3-2 PHASE B CHECKLIST ITEMS O AND P
DATE

February 9, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

3.4.3

DOCUMENT CHANGE MEMO

DCA2009-PM-1 Page 3-8 & 3-10

SECTION 3 - SUBMISSION REQUIREMENTS ADD REFERENCE TO MANUAL FOR UNIT CODES IN SECTION 3.4.4.2 - PHASE C SUBMISSION ITEM 14 AND EXHIBIT 3-3 PRE-PHASE C AND PHASE C CHECKLIST ITEMS L & M
DATE

February 9, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

3.4.2

DOCUMENT CHANGE MEMO

DCA2009-PM-1 Page 3-13 & 3-14

SECTION 3 - SUBMISSION REQUIREMENTS ADD REFERENCE TO MANUAL FOR UNIT CODES IN SECTION 3.4.5- PHASE D SUBMISSION ITEM 10 AND EXHIBIT 3-4 PHASE D CHECKLIST ITEM J
DATE

February 9, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

3.4.5

DOCUMENT CHANGE MEMO

DCA2009-PM-1 Page 3-15 & 3-16

SECTION 10 REPLACE STANDARD ITEM NUMBERS WITH UNIT CODES IN SECTION 10.1 FINAL ENGINEERS ESTIMATE AND EXHIBIT 10-1 SAMPLE FINAL ENGINEERS ESTIMATE
DATE

February 9, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

10-1

DOCUMENT CHANGE MEMO

DCA2009-PM-1 Page 10-3

UTILITY ALIGNMENT
DATE

December 18, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

7.2.1

DOCUMENT CHANGE MEMO

DCA2007-PM-1 Page 7-2

PHASE A SUBMISSION
DATE

December 11, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

3.4.2

DOCUMENT CHANGE MEMO

DCA2007-PM-2 Page 3-4

REVISED REQUEST PROCEDURES
DATE

August 2, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

1.3.2

DOCUMENT CHANGE MEMO

N/A

ISSUANCE OF THE PROCEDURES MANUAL
DATE

June 6, 2007

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ALL

DOCUMENT CHANGE MEMO

N/A

Road User Cost DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

Issuance of Road User Cost Manual
DATE

August 24, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

All

DOCUMENT CHANGE MEMO

N/A

Standard Drawings DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

Fall Protection for Sign Repair
DATE

November 19, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Drawing VM-10 Overhead Span VMS/VSLS Support Structures - Bill Of Materials Drawing CM-10 Overhead Span HCMS Support Structures, Bill Of Materials

DOCUMENT CHANGE MEMO

DCA2024SD 02

Keeper Angle Welds for Elastomeric Bearing Pads
DATE

November 19, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Drawing BR-10 Laminated Elastomeric Bearing Details

DOCUMENT CHANGE MEMO

DCA2024SD 03

Electrical Qualification Criteria Updates
DATE

January 9, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Drawing E-01 Lighting Standard Key Sheet Drawing E-02 Steel Lighting Standard Drawing E-04 Expressway Lighting Standard - 40 Foot Nominal Mounting Height Drawing E-05 Expressway Lighting Standard - 48 Foot Nominal Mounting Height Drawing E-09 Transformer Base And Pole Grounding Details Drawing E-11 Lighting Standard Bases Drawing E-13 Junction Box Type C Drawing E-18 Roadway Lighting Installation Details - I Drawing E-19 Roadway Lighting Installation Details - 2 Drawing E-20 Roadway Lighting Installation Detaile - 3

DOCUMENT CHANGE MEMO

DCA2024SD 01

Sign Structure Truss Connection Details
DATE

October 19, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-2 - Mainline Structure, CM-3 - Ramp Structure, CM-4, Truss And Field Splice Details, CM-5, Truss And Fence Details, CM-6 Door Details, CM-7 End Frame Details, CM-8, Access Ladder And Platform Details, CM-10 Bill Of Materials, VM-1 - General Plan & Elevation, VM-2 - Truss Details, VM-3 - Truss & Fence Details, VM-4 - Door Details, VM-5 - End Frame Details, VM-6 - Access Ladder & Platform Details, VM-17 - General Plan & Elevation, VM-18 - Truss & Field Splice Details, VM-19 - Truss & Fence Details, VM-20 - End Frame Details, VM-21 - Access Ladder & Platform Details

DOCUMENT CHANGE MEMO

DCA2023SD 04

Updates PCCD and temporary attenuator standards for MASH compliance
DATE

September 22, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Standard Drawing TP-22, TP-23, TP-23A

DOCUMENT CHANGE MEMO

DCA2023SD 03

Concrete Median Barrier Mounted Sign Details
DATE

August 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-27 Concrete Median Barrier Mounted Sign Details

DOCUMENT CHANGE MEMO

DCA2023SD 02

Lip Curb Inlet
DATE

February 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CU-4 Lip Curb and Inlet Treatment At Bridge Structures DR-5 Concrete Gutter And Slope Drain Details

DOCUMENT CHANGE MEMO

DCA2023SD-01

Vierendeel Sign Structure Details
DATE

December 12, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-29 Vierendeel Span Type Sign Structure (Spans From 60 To 90 Feet) Sections SI-37 Vierendeel Cantilever Type Sign Structure (Spans From 20 To 42 Feet

DOCUMENT CHANGE MEMO

DCA2022SD-04

Miscellaneous Updates to Bridge Drawings
DATE

October 10, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-2A Bridge Drainage Details - I BR-2B Bridge Drainage Details - II BR-5 Concrete Slope Protection BR-6 Bridge Approach Slabs BR-7 Barrier Parapet Details BR-8 Stone Slope Protection BR-10 Laminated Elastomeric Bearing Details BR-12 HLMR Bearing Details BR-13 Strip Seals - I BR-15 Parapet Lighting Blister And Type D Junction Box Details BR-16 Box Girder Hatch Cover And Drainage Details

DOCUMENT CHANGE MEMO

DCA2022SD-02

Parallel Acceleration Lane
DATE

September 27, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-1 Entrance Ramp Markings PM-2 Multilane Entrance Ramp Markings

DOCUMENT CHANGE MEMO

DCA2022SD-03

Manhole Frame and Cover & Inlet Frames and Grates
DATE

February 17, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DR-2 Cast Frame and Grating Details DR-3 Manhole and Pipe Placement Details

DOCUMENT CHANGE MEMO

DCA2022SD-01

Lighting and Power Distribution Systems
DATE

November 23, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

All Electrical (E) Standard Drawings

DOCUMENT CHANGE MEMO

DCA2021SD-02

Longitudinal Barriers
DATE

August 6, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-7, BR-15, CU-1, CU-2, CU-3, CU-4, GR-1, GR-2, GR-3, GR-4, GR-5, GR-6, GR-7, GR-8, GR-9, GR-10, GR-11, GR-12, GR-13, GR-14, GR-15, GR-16, GR-17, GR-18, GR-19 , GR-20 MB-1, MB-2, MB-3, MB-4, MF-1, MF-2

DOCUMENT CHANGE MEMO

DCA2021SD-01

This deletes Standard Drawing E-29, Schedule of Approved Luminaires. Approved luminaires are found on the Qualified Products List (QPL).
DATE

March 9, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Standard Drawing E-29

DOCUMENT CHANGE MEMO

DCA2018SD-01

Minor edits to Detail 12 for VM-5. Also corresponding revision to the index of drawings, Sheet 2.
DATE

December 14, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-5

DOCUMENT CHANGE MEMO

DCA2017SD-02.pdf

Standard Drawings TP-1, TP-2, TP-3, TP-4, TP-5, TP-6, TP-7, TP-8, TP-9, TP-10, TP-11, TP-12, TP-13, TP-14, TP-15, TP-16, TP-17, TP-18, TP-19, TP-20, TP-21, TP-22A, TP-22B, TP-23, TP-24, TP-25, TP-26, and TP-27 are revised as described in the attached Document update request memos.
DATE

May 11, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

TP-1, TP-2, TP-3, TP-4, TP-5, TP-6, TP-7, TP-8, TP-9, TP-10, TP-11, TP-12, TP-13, TP-14, TP-15, TP-16, TP-17, TP-18, TP-19, TP-20, TP-21, TP-22A, TP-22B, TP-23, TP-24, TP-25, TP-26, and TP-27

DOCUMENT CHANGE MEMO

DCA2017SD-01

The ground mounted sign details have been updated to be in conformance with AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals.
DATE

December 5, 2016

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-11, CM-12, VM-24, SL-1, SL-2, SL-3, SL-4, SL-5, SL-6, SL-7, SI-43, SI-44, SI-45, SI-46 and SI-47

DOCUMENT CHANGE MEMO

DCA2016-SD-02

Standard Drawings Br-13, VM-1, VM-2, VM-3, VM-4, VM-5, VM-10, VM-19, VM-20, CM-5, CM-7, and CM-10 are revised as described in the attached Document update request memos.
DATE

May 5, 2016

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Br-13, VM-1, VM-2, VM-3, VM-4, VM-5, VM-10, VM-19, VM-20, CM-5, CM-7, and CM-10

DOCUMENT CHANGE MEMO

DCA2016-SD-01

Standard Drawings PM-1 to PM-6, TP-28 to TP-34, and SI-37 have been revised.
DATE

September 10, 2015

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-1 to PM-6, TP-28 to TP-34, and SI-37

DOCUMENT CHANGE MEMO

dca_2015-sd-01.pdf

Minor revisions made to the existing Standard Drawings BR-10, SI-17A, SI-22A, SI-32 and SI-34.
DATE

December 3, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-10, SI-17A, SI-22A, SI-32 and SI-34

DOCUMENT CHANGE MEMO

DCA2014-SD-05

New Standard Drawings for mobile lane closings TP-28 to TP-34 and minor revisions to the existing Standard Drawings BF-1, BF-2, BF-3, BF-4, BR-7, BR-16, ITS-2, ITS-10, ITS-13, ITS-17, ITS-22, ITS-23, ITS-24, ITS-33, ITS-34, ITS-38, ITS-40A, ITS-41, ITS-42, ITS-42A, ITS-43, ITS-44, ITS-45 & SI-18B.
DATE

June 13, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BF-1, BF-2, BF-3, BF-4, BR-7, BR-16, ITS-2, ITS-10, ITS-13, ITS-17, ITS-22, ITS-23, ITS-24, ITS-33, ITS-34, ITS-38, ITS-40A, ITS-41, ITS-42, ITS-42A, ITS-43, ITS-44, ITS-45 & SI-18B

DOCUMENT CHANGE MEMO

DCA2014-SD-04

The following Standard Drawings have been revised and updated: E-02, E-03, E-03A, E-09, E-28, E-29, VM-1, VM-2, VM-4, VM-5, VM-6, VM-8, VM-9, VM-10, VM-11, VM-12, VM-13, VM-17, VM-20, VM-21, CM-2, CM-3, CM-6, CM-7, CM-8, CM-9, CM-10, SI-22 and SI-42.
DATE

April 15, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02, E-03, E-03A, E-09, E-28, E-29, VM-1, VM-2, VM-4, VM-5, VM-6, VM-8, VM-9, VM-10, VM-11, VM-12, VM-13, VM-17, VM-20, VM-21, CM-2, CM-3, CM-6, CM-7, CM-8, CM-9, CM-10, SI-22 and SI-42

DOCUMENT CHANGE MEMO

DCA2014-SD-03

Added the optional poured-in-place monument detail to Standard Drawing sheet DE-1. Modified the existing precast monument detail to be set flush with the finished grade.
DATE

January 23, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DE-1

DOCUMENT CHANGE MEMO

DCA2014-SD-02

Standard Drawings ITS-01 to ITS-36 have been updated to confirm set with a cleaner appearance by removing all previous notations and a large number of previous revision and added a spare 50 micron 6-fiber optic cable from SCC to VMS for future use. Issuance of New Standard Drawings ITS-37 to ITS-48 for Hybrid Changeable Message Sign (HCMS).
DATE

January 16, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ITS-01 through ITS-36, ITS-37 through ITS-48

DOCUMENT CHANGE MEMO

DCA2014-SD-01

Replace Drawings GR-7, GR-11, ITS-17 and ITS-18 with revised Drawings GR-7, GR-11, ITS-17 and ITS-18, Replace Index of Standard Drawings, sheets 1 and 2.
DATE

March 11, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-7, GR-11, ITS-17 and ITS-18

DOCUMENT CHANGE MEMO

DCA2013-SD-02

Replace Drawings DE-1 and DE-2 with new and revised Drawings DE-1 to DE-6. Replace Drawings E-21, E-22 and E-29 with revised and reissued Drawings E-21, E-22 and E-29. Replace Drawings GR-5, GR-14 and GR-15 with revised Drawings GR-5, GR-14 and GR-15. Replace Drawings PM-1 to PM-4 with revised and reissued Drawings PM-1 to PM-4. Remove Drawings SI-1 to SI-12 and add new Drawings SL-1 to SL-27. Replace Drawings SI-22B and SI-28 to SI-42 with revised Drawings SI-22B and SI-28 to SI-42. Replace Index of Standard Drawings, sheets 1 and 2.
DATE

January 17, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DE-1 - DE-6, E-21- E-22, E-29, GR-5, GR-14 - GR-15, PM-1 - PM-4, SL-1 - SL-27, SI-22B, SI-28 - SI-42

DOCUMENT CHANGE MEMO

DCA2013-SD-01

Revised the contrast striping details for both paint and tape applications. A table of Standard Striping Materials and Procedures was removed from the specifications and relocated to the New Standard Drawing PM-5.
DATE

September 12, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-5

DOCUMENT CHANGE MEMO

DCA2012-SD-08

Utility companies now require a Meter Disconnect before the meter (cold sequence) for 480 volt services. Drawings E-32, E-33, E-34 and E-35 have been updated to accommodate the disconnect switch and other minor changes.
DATE

August 28, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-32, E-33, E-34, E-35

DOCUMENT CHANGE MEMO

DCA2012-SD-07

A new Standard Drawing BR-9 has developed. BR-9 will provide guidance to Design Engineers for the design and detailing requirements for Seismic Isolation Bearings similar to how BR-10 and BR-12 do for Elastomeric and HLMR Bearings respectively.
DATE

July 11, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-9

DOCUMENT CHANGE MEMO

DCA2012-SD-06

Standard Drawings E-01, E-03 and E-03A have been revised. E-03A has been created to provide details for both Type H and Type V pole-top luminaire mounting assembly details. E-03 has been revised; all mounting details were moved to E-03A. E-01 has been revised to agree with E-03 and E-03A.
DATE

June 5, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-01, E-03 and E-03A

DOCUMENT CHANGE MEMO

DCA2012-SD-05

Standard Drawings E-02 through E-05 have been revised to include an "Instruction to Designers" note to each sheet to reflect the Authority's intent for fatigue design of bridge mounted lighting standards.
DATE

April 24, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02 through E-05

DOCUMENT CHANGE MEMO

DCA2012-SD-04

Standard Drawing BR-12 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and to provide additional options for HLMR bearings.
DATE

April 17, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-12

DOCUMENT CHANGE MEMO

DCA2012-SD-03

Standard Drawing BR-10 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and preferred detailing to allow for ease of future bearing replacement.
DATE

April 17, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-10

DOCUMENT CHANGE MEMO

DCA2012-SD-02

Standard Drawings ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9 have been revised to include modifications required to clarify grounding details.
DATE

March 1, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9

DOCUMENT CHANGE MEMO

DCA2012-SD-01

Standard Drawing E-02 through E-05 have been revised to reflect recent updates to design standard minimums for bridge mounted lighting to mitigate fatigue issues in welded aluminum light standards.
DATE

November 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02 through E-05

DOCUMENT CHANGE MEMO

DCA2011-SD-06

Standard Drawing VM-8 has been revised to include CSL tubes in the drill shaft foundation to be consistent with the Standard Supplemental Specifications. Standard Drawing VM-11 has been revised to correct dimensional criteria for the edge of the sign chord and the lane line at the request of NJTA Operations Department.
DATE

September 19, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-8 and VM-11

DOCUMENT CHANGE MEMO

DCA2011-SD-05

Standard Drawing GR-9 has been modified to simplify Berm Surfacing detail. E-14 has been modified to revise Median/Parapet detail. ITS-1 to 15 and ITS-17 to 34, VM-1 to 22, and CM-1 to 10 has been revised.
DATE

May 16, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-9, E-14, ITS-1 to 15, ITS-17 to 34, VM-1 to 22, CM-1 to 10

DOCUMENT CHANGE MEMO

DCA2011-SD-04

Standard Drawings SI-35 has been revised to more clearly define the provisional sign area and to identify the edge of pavement in the elevation view.
DATE

April 6, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-35

DOCUMENT CHANGE MEMO

DCA2011-SD-03

Standard Drawings BR-16 has been created to provide necessary details for box girder pier cap drainage and hatch covers. Providing these details will ensure consistency in design of new structures as well as for revisions to existing structures.
DATE

March 4, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-16

DOCUMENT CHANGE MEMO

DCA2011-SD-02

Standard Drawings FE-1 and FE-2 have been revised to provide currently available fence options. ITS-10 has been revised to provide consistency in drafting conduit line style.
DATE

January 3, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

FE-1, FE-2 & ITS-10

DOCUMENT CHANGE MEMO

DCA2011-SD-01

Standard Drawings SI-28 to SI-42 have been developed to standardize the design and construction of overhead span and cantilever type sign structures to be utilized on the Garden State Parkway.
DATE

October 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-28 to SI-42

DOCUMENT CHANGE MEMO

DCA2010-SD-11

Standard Drawings BR-05, BR-13 & FX-1 will update the method of sealing joint between concrete slope protection and abutment face to utilize modern and readily available plastic waterstops in lieu of flashing; waterstops for working joints are available. The new configuration will facilitate construction by removing labor intensive tasks of constructing reglet, flashing and caulking.
DATE

September 28, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-5, BR-13 & FX-1

DOCUMENT CHANGE MEMO

DCA2010-SD-10

Standard Drawing GR-05 is required to update general notes. Standard Drawings PM-01 to PM-06 have been revised to comply with MUTCD 2009 and current design standards.
DATE

September 22, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-05 and PM-01 – PM-06

DOCUMENT CHANGE MEMO

DCA2010-SD-09

Standard Drawings BR-15, E-14, E-21, E-22 and E-24 have been revised to accommodate changes in lighting design and equipment requirements.
DATE

September 15, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-15, E-14, E-21, E-22 and E-24

DOCUMENT CHANGE MEMO

DCA2010-SD-07

The new Standard Drawings ITS-1 through ITS-34 are new drawings which have been developed in support of Intelligent Transportation System (ITS) device and infrastructure installations.
DATE

September 15, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

TS-1 through ITS-34

DOCUMENT CHANGE MEMO

DCA2010-SD-08

New Standard Drawings VM-17 through VM-22 for VM overhead sign structure with spans greater than 85 feet.
DATE

September 2, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-17 through VM-22

DOCUMENT CHANGE MEMO

DCA 2010-SD-06

Standard Drawing BR-13 has been revised to improve detailing based on current practices by the joint manufacturers and to reflect recent NJTA Design Manual changes.
DATE

July 28, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-13

DOCUMENT CHANGE MEMO

DCA 2010-SD-05

Revisions to Standard Drawings VM-01, VM-02, VM-04 through VM-08, VM-10, VM-17, VM-18 and VM-20 through VM-22
DATE

June 30, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-01, VM-02, VM-04 through VM-08, VM-10, VM-17, VM-18, VM-20 through VM-22

DOCUMENT CHANGE MEMO

DCA 2010-SD-04

New Standard Drawings CM-01 through CM-10 has been developed.
DATE

April 6, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-01, CM-02, CM-03, CM-04, CM-05, CM-06, CM-07, CM-08, CM-09 and CM-10

DOCUMENT CHANGE MEMO

DCA 2010-SD-03

Standard Drawings for DATIM Enclosures, Sheets TB-8 through TB-11 have been developed.
DATE

March 3, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Index-1, TB-8, TB-9, TB-10 and TB-11

DOCUMENT CHANGE MEMO

DCA 2010-SD-02

Revisions to Standard Drawings SI-13, SI-17, S-18B, VM-01, VM-08, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-09.
DATE

February 2, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-13, SI-17, S-18B, VM-01, VM-08, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-09

DOCUMENT CHANGE MEMO

DCA2010-SD-01

Traffic Manual DCAs


DESCRIPTION


DATE

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT


DOCUMENT CHANGE MEMO

REFER TO THE ATTACHED DOCUMENT CHANGE REQUEST FORM FOR MORE INFORMATION
DATE

May 11, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

New Issuance of the Traffic Manual

DOCUMENT CHANGE MEMO

DCA2017TM-01

NEW TRAFFIC PROTECTION STANDARD DRAWINGS TP-28 TO TP-34 FOR MOBILE LANE CLOSINGS HAS BEEN ADDED AS A REFERENCE.
DATE

June 13, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

TP28 to TP-34

DOCUMENT CHANGE MEMO

DCA2014-TM-01

ADD SUBSECTION 3.2.6 DESCRIBING REQUIREMENTS RELATED TO THE INSTALLATION OF LANE SHIFTS DURING THE “SUMMER” SEASON ON THE GARDEN STATE PARKWAY.
DATE

September 5, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Subsection 3.2.6

DOCUMENT CHANGE MEMO

DCA2012-TM-01

TRAFFIC PROTECTION STANDARD DRAWINGS TP-1 THRU TP-22B HAVE BEEN UPDATED AND NEW TRAFFIC PROTECTION STANDARD DRAWINGS TP-26 TOLL LANE CLOSINGS AND TP-27 CONSTRUCTION ACCESS ARE BEING ADDED.
DATE

May 16, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Appendix A

DOCUMENT CHANGE MEMO

DCA2011-TM-01

ISSUANCE OF TRAFFIC MANUAL
DATE

October 1, 2009

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

All

DOCUMENT CHANGE MEMO

N/A