Clicky

skip to main content
Doing Business with the NJTA

Supplemental Links

 

 

Supplemental Links Change Log  Revised 04-10-2025

  1. Project Checklist without Samples
  2. Project Checklist_June2024_MMS-CD
  3. Project Checklist_MMS-PD_Phase A
  4. Project Checklist_June2024_MMS_FD_Pre-Phase B
  5. Project Checklist_June2024_MMS-FD_Phase B
  6. Project Checklist_MMS-FD_Pre-PhaseC
  7. Project Checklist_MMS-FD_PhaseC
  8. Project Checklist_June2024_MMS-FD_PhaseD
  9. Project Checklist_June2024_MMS-FD_Post-PhaseD
  10. Guidance for Electronic and Hard Copy Submittals
  11. Sample Stakeholder Outreach Plan (Provided by NJTA Liaison)
  12. Outside Agency Coordination Log Template
  13. Design Decision Report Template
  14. Risk Register Template
  15. Design Exception Guidance
  16. Concept Development Report Template
  17. Preliminary Design Report Template
  18. Preliminary Design Report Template (Maintenance Repair)
  19. Shop Drawing Review Guidelines
  20. CapEx & Specifications Design Guidelines   Revised 04-10-2025
  21. Sample Engineer's Estimate    Revised 04-10-2025
  22. Engineer's Estimate Update Guidance (provided by NJTA Liaison)
  23. As-Built Plan Preparation Guidelines
  24. Utility Contact Letter Template
  25. Summary of Permit Requirements
  26. Traffic Impact Notices Template
  27. Highway Agency Stormwater General Permit "Phase D" Checklist (provided by NJTA Liaison)
  28. Materials Acceptance Review Matrix Template
  29. NJTA QPL Pilot Form Revised 02-25-2025
  30. Bridge Inspection Program
  31. Fiber Optic Cable Contract Documents Review Certification
  32. Fiber Optic Cable Design Review Certification
  33. Guidance for Electronic NJDEP DLRP Applications
  34. Guidelines For Use Of VMS Systems For Construction Revised 10-05-2020
  35. License to Cross Application Revised 9-2023
  36. Multipliers for Professional Services
  37. Sign Request Form
  38. Supplemental Sign Policy
  39. Traffic Permit Application Revised 1-2019
  40. Load Rating
  41. Supplementary Products List (SPL Form) 09-11-2020
  42. Sample Addendum Files 12-19-2024
  43. Utility Checklist
  44. Initial Contact Letter
  45. Utility Status Schedule
  46. Sample Utility Checklist
  47. Supplemental Utility Order
  48. Utility Order
  49. Standard Voltage Drop Computation Form
  50. Road User Cost Manual & Worksheets
  51. CD Report TOC
  52. Design Communication Report
  53. PD Report TOC
  54. PD Report TOC-Maintenance
  55. Sample Public Involvement Action Plan