Revision to Index of Standard Drawings


DESCRIPTION


DATE

REVISED SECTION/ SUBSECTION/ DRAWING


DOCUMENT CHANGE MEMO

Electrical Qualification Criteria Updates
DATE

January 9, 2024

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-01 Lighting Standard Key Sheet E-02 Steel Lighting Standard E-04 Expressway Lighting Standard - 40 Foot Nominal Mounting Height E-05 Expressway Lighting Standard - 48 Foot Nominal Mounting Height E-09 Transformer Base And Pole Grounding Details E-11 Lighting Standard Bases E-13 Junction Box Type C E-18 Roadway Lighting Installation Details - I E-19 Roadway Lighting Installation Details - 2 E-20 Roadway Lighting Installation Details - 3

DOCUMENT CHANGE MEMO

DCA2024SD 01

Sign Structure Truss Connection Details
DATE

October 19, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-2 - Mainline Structure, CM-3 - Ramp Structure, CM-4, Truss And Field Splice Details, CM-5, Truss And Fence Details, CM-6 Door Details, CM-7 End Frame Details, CM-8, Access Ladder And Platform Details, CM-10 Bill Of Materials, VM-1 - General Plan & Elevation, VM-2 - Truss Details, VM-3 - Truss & Fence Details, VM-4 - Door Details, VM-5 - End Frame Details, VM-6 - Access Ladder & Platform Details, VM-10 – Overhead Span VMS/VSLS Support Structures – Bill of MaterialsVM-17 - General Plan & Elevation, VM-18 - Truss & Field Splice Details,VM-19 - Truss & Fence Details, VM-20 - End Frame Details, VM-21 - Access Ladder & Platform Details

DOCUMENT CHANGE MEMO

DCA2023SD 04 Rev1

Updates PCCD and temporary attenuator standards for MASH compliance
DATE

September 22, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Standard Drawing TP-22, TP-23, TP-23A

DOCUMENT CHANGE MEMO

DCA2023SD 03

Concrete Median Barrier Mounted Sign Details
DATE

August 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-27 Concrete Median Barrier Mounted Sign Details

DOCUMENT CHANGE MEMO

DCA2023SD 02

Lip Curb Inlet
DATE

February 10, 2023

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CU-4 Lip Curb and Inlet Treatment At Bridge Structures DR-5 Concrete Gutter And Slope Drain Details

DOCUMENT CHANGE MEMO

DCA2023SD-01.pdf

Vierendeel Sign Structure Details
DATE

December 12, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-29 Vierendeel Span Type Sign Structure (Spans From 60 To 90 Feet) Sections SI-37 Vierendeel Cantilever Type Sign Structure (Spans From 20 To 42 Feet)

DOCUMENT CHANGE MEMO

DCA2022SD-04.pdf

Miscellaneous Updates to Bridge Drawings
DATE

October 10, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-2A Bridge Drainage Details - I BR-2B Bridge Drainage Details - II BR-5 Concrete Slope Protection BR-6 Bridge Approach Slabs BR-7 Barrier Parapet Details BR-8 Stone Slope Protection BR-10 Laminated Elastomeric Bearing Details BR-12 HLMR Bearing Details BR-13 Strip Seals - I BR-15 Parapet Lighting Blister And Type D Junction Box Details BR-16 Box Girder Hatch Cover And Drainage Details

DOCUMENT CHANGE MEMO

DCA2022SD-02.pdf

Parallel Acceleration Lane
DATE

September 27, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-1 Entrance Ramp Markings PM-2 Multilane Entrance Ramp Markings

DOCUMENT CHANGE MEMO

DCA2022SD-03.pdf

Manhole Frame and Cover & Inlet Frames and Grates
DATE

February 17, 2022

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DR-2 Cast Frame and Grating Details DR-3 Manhole and Pipe Placement Details

DOCUMENT CHANGE MEMO

DCA2022SD-01.pdf

Lighting and Power Distribution Systems
DATE

November 23, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

All Electrical (E) Standard Drawings

DOCUMENT CHANGE MEMO

DCA2021SD-02.pdf (1)

Longitudinal Barriers
DATE

August 6, 2021

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-7, BR-15, CU-1, CU-2, CU-3, CU-4, GR-1, GR-2, GR-3, GR-4, GR-5, GR-6, GR-7, GR-8, GR-9, GR-10, GR-11, GR-12, GR-13, GR-14, GR-15, GR-16, GR-17, GR-18, GR-19 , GR-20 MB-1, MB-2, MB-3, MB-4, MF-1, MF-2

DOCUMENT CHANGE MEMO

DCA2021SD-01.pdf

This deletes Standard Drawing E-29, Schedule of Approved Luminaires. Approved luminaires are found on the Qualified Products List (QPL).
DATE

March 9, 2018

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Standard Drawing E-29

DOCUMENT CHANGE MEMO

DCA2018SD-01.pdf

Minor edits to Detail 12 for VM-5. Also corresponding revision to the index of drawings, Sheet 2.
DATE

December 14, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-5

DOCUMENT CHANGE MEMO

DCA2017SD-02.pdf

Standard Drawings TP-1, TP-2, TP-3, TP-4, TP-5, TP-6, TP-7, TP-8, TP-9, TP-10, TP-11, TP-12, TP-13, TP-14, TP-15, TP-16, TP-17, TP-18, TP-19, TP-20, TP-21, TP-22A, TP-22B, TP-23, TP-24, TP-25, TP-26, and TP-27 are revised as described in the attached Document update request memos.
DATE

May 11, 2017

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

TP-1, TP-2, TP-3, TP-4, TP-5, TP-6, TP-7, TP-8, TP-9, TP-10, TP-11, TP-12, TP-13, TP-14, TP-15, TP-16, TP-17, TP-18, TP-19, TP-20, TP-21, TP-22A, TP-22B, TP-23, TP-24, TP-25, TP-26, and TP-27

DOCUMENT CHANGE MEMO

DCA2017SD-01

The ground mounted sign details have been updated to be in conformance with AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals.
DATE

December 5, 2016

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-11, CM-12, VM-24, SL-1, SL-2, SL-3, SL-4, SL-5, SL-6, SL-7, SI-43, SI-44, SI-45, SI-46 and SI-47

DOCUMENT CHANGE MEMO

DCA2016-SD-02

Standard Drawings Br-13, VM-1, VM-2, VM-3, VM-4, VM-5, VM-10, VM-19, VM-20, CM-5, CM-7, and CM-10 are revised as described in the attached Document update request memos.
DATE

May 5, 2016

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Br-13, VM-1, VM-2, VM-3, VM-4, VM-5, VM-10, VM-19, VM-20, CM-5, CM-7, and CM-10

DOCUMENT CHANGE MEMO

DCA2016-SD-01

Standard Drawings PM-1 to PM-6, TP-28 to TP-34, and SI-37 have been revised.
DATE

September 10, 2015

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-1 to PM-6, TP-28 to TP-34, and SI-37

DOCUMENT CHANGE MEMO

DCA2015-SD-01

Minor revisions made to the existing Standard Drawings BR-10, SI-17A, SI-22A, SI-32 and SI-34.
DATE

December 3, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-10, SI-17A, SI-22A, SI-32 and SI-34

DOCUMENT CHANGE MEMO

DCA2014-SD-05

New Standard Drawings for mobile lane closings TP-28 to TP-34 and minor revisions to the existing Standard Drawings BF-1, BF-2, BF-3, BF-4, BR-7, BR-16, ITS-2, ITS-10, ITS-13, ITS-17, ITS-22, ITS-23, ITS-24, ITS-33, ITS-34, ITS-38, ITS-40A, ITS-41, ITS-42, ITS-42A, ITS-43, ITS-44, ITS-45 & SI-18B.
DATE

June 13, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BF-1, BF-2, BF-3, BF-4, BR-7, BR-16, ITS-2, ITS-10, ITS-13, ITS-17, ITS-22, ITS-23, ITS-24, ITS-33, ITS-34, ITS-38, ITS-40A, ITS-41, ITS-42, ITS-42A, ITS-43, ITS-44, ITS-45 & SI-18B

DOCUMENT CHANGE MEMO

DCA2014-SD-04

The following Standard Drawings have been revised and updated: E-02, E-03, E-03A, E-09, E-28, E-29, VM-1, VM-2, VM-4, VM-5, VM-6, VM-8, VM-9, VM-10, VM-11, VM-12, VM-13, VM-17, VM-20, VM-21, CM-2, CM-3, CM-6, CM-7, CM-8, CM-9, CM-10, SI-22 and SI-42.
DATE

April 15, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02, E-03, E-03A, E-09, E-28, E-29, VM-1, VM-2, VM-4, VM-5, VM-6, VM-8, VM-9, VM-10, VM-11, VM-12, VM-13, VM-17, VM-20, VM-21, CM-2, CM-3, CM-6, CM-7, CM-8, CM-9, CM-10, SI-22 and SI-42

DOCUMENT CHANGE MEMO

DCA2014-SD-03

Added the optional poured-in-place monument detail to Standard Drawing sheet DE-1. Modified the existing precast monument detail to be set flush with the finished grade.
DATE

January 23, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DE-1

DOCUMENT CHANGE MEMO

DCA2014-SD-02

Standard Drawings ITS-01 to ITS-36 have been updated to confirm set with a cleaner appearance by removing all previous notations and a large number of previous revision and added a spare 50 micron 6-fiber optic cable from SCC to VMS for future use. Issuance of New Standard Drawings ITS-37 to ITS-48 for Hybrid Changeable Message Sign (HCMS).
DATE

January 16, 2014

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ITS-01 through ITS-36, ITS-37 through ITS-48

DOCUMENT CHANGE MEMO

DCA2014-SD-01

Replace Drawings GR-7, GR-11, ITS-17 and ITS-18 with revised Drawings GR-7, GR-11, ITS-17 and ITS-18, Replace Index of Standard Drawings, sheets 1 and 2.
DATE

March 11, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-7, GR-11, ITS-17 and ITS-18

DOCUMENT CHANGE MEMO

DCA2013-SD-02

Replace Drawings DE-1 and DE-2 with new and revised Drawings DE-1 to DE-6.
Replace Drawings E-21, E-22 and E-29 with revised and reissued Drawings E-21, E-22 and E-29.
Replace Drawings GR-5, GR-14 and GR-15 with revised Drawings GR-5, GR-14 and GR-15.
Replace Drawings PM-1 to PM-4 with revised and reissued Drawings PM-1 to PM-4.
Remove Drawings SI-1 to SI-12 and add new Drawings SL-1 to SL-27.
Replace Drawings SI-22B and SI-28 to SI-42 with revised Drawings SI-22B and SI-28 to SI-42.
Replace Index of Standard Drawings, sheets 1 and 2.
DATE

January 17, 2013

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

DE-1 - DE-6, E-21- E-22, E-29, GR-5, GR-14 - GR-15, PM-1 - PM-4, SL-1 - SL-27, SI-22B, SI-28 - SI-42

DOCUMENT CHANGE MEMO

DCA2013-SD-01

Revised the contrast striping details for both paint and tape applications. A table of Standard Striping Materials and Procedures was removed from the specifications and relocated to the New Standard Drawing PM-5.
DATE

September 12, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

PM-5

DOCUMENT CHANGE MEMO

DCA2012-SD-08

Utility companies now require a Meter Disconnect before the meter (cold sequence) for 480 volt services. Drawings E-32, E-33, E-34 and E-35 have been updated to accommodate the disconnect switch and other minor changes.
DATE

August 28, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-32, E-33, E-34, E-35

DOCUMENT CHANGE MEMO

DCA2012-SD-07

A new Standard Drawing BR-9 has developed. BR-9 will provide guidance to Design Engineers for the design and detailing requirements for Seismic Isolation Bearings similar to how BR-10 and BR-12 do for Elastomeric and HLMR Bearings respectively.
DATE

July 11, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-9

DOCUMENT CHANGE MEMO

DCA2012-SD-06

Standard Drawings E-01, E-03 and E-03A have been revised. E-03A has been created to provide details for both Type H and Type V pole-top luminaire mounting assembly details. E-03 has been revised; all mounting details were moved to E-03A. E-01 has been revised to agree with E-03 and E-03A.
DATE

June 5, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-01, E-03 and E-03A

DOCUMENT CHANGE MEMO

DCA2012-SD-05

Standard Drawings E-02 through E-05 have been revised to include an "Instruction to Designers" note to each sheet to reflect the Authority's intent for fatigue design of bridge mounted lighting standards.
DATE

April 24, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02 through E-05

DOCUMENT CHANGE MEMO

DCA2012-SD-04

Standard Drawing BR-10 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and preferred detailing to allow for ease of future bearing replacement.
DATE

April 17, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-10

DOCUMENT CHANGE MEMO

DCA2012-SD-02

Standard Drawing BR-12 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and to provide additional options for HLMR bearings.
DATE

April 17, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-12

DOCUMENT CHANGE MEMO

DCA2012-SD-03

Standard Drawings ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9 have been revised to include modifications required to clarify grounding details.
DATE

March 1, 2012

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9

DOCUMENT CHANGE MEMO

DCA2012-SD-01

Standard Drawing E-02 through E-05 have been revised to reflect recent updates to design standard minimums for bridge mounted lighting to mitigate fatigue issues in welded aluminum light standards.
DATE

November 7, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

E-02 through E-05

DOCUMENT CHANGE MEMO

DCA2011-SD-06

Standard Drawing VM-8 has been revised to include CSL tubes in the drill shaft foundation to be consistent with the Standard Supplemental Specifications. Standard Drawing VM-11 has been revised to correct dimensional criteria for the edge of the sign chord and the lane line at the request of NJTA Operations Department.
DATE

September 19, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-8 and VM-11

DOCUMENT CHANGE MEMO

DCA2011-SD-05

Standard Drawing GR-9 has been modified to simplify Berm Surfacing detail. E-14 has been modified to revise Median/Parapet detail. ITS-1 to 15 and ITS-17 to 34, VM-1 to 22, and CM-1 to 10 has been revised.
DATE

May 16, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-9, E-14, ITS-1 to 15, ITS-17 to 34, VM-1 to 22, CM-1 to 10

DOCUMENT CHANGE MEMO

DCA2011-SD-04

Standard Drawings SI-35 has been revised to more clearly define the provisional sign area and to identify the edge of pavement in the elevation view.
DATE

April 6, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-35

DOCUMENT CHANGE MEMO

DCA2011-SD-03

Standard Drawings BR-16 has been created to provide necessary details for box girder pier cap drainage and hatch covers. Providing these details will ensure consistency in design of new structures as well as for revisions to existing structures.
DATE

March 4, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-16

DOCUMENT CHANGE MEMO

DCA2011-SD-02

Standard Drawings FE-1 and FE-2 have been revised to provide currently available fence options. ITS-10 has been revised to provide consistency in drafting conduit line style.
DATE

January 3, 2011

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

FE-1, FE-2 & ITS-10

DOCUMENT CHANGE MEMO

DCA2011-SD-01

Standard Drawings SI-28 to SI-42 have been developed to standardize the design and construction of overhead span and cantilever type sign structures to be utilized on the Garden State Parkway.
DATE

October 21, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-28 to SI-42

DOCUMENT CHANGE MEMO

DCA2010-SD-11

Standard Drawings BR-05, BR-13 & FX-1 will update the method of sealing joint between concrete slope protection and abutment face to utilize modern and readily available plastic waterstops in lieu of flashing; waterstops for working joints are available. The new configuration will facilitate construction by removing labor intensive tasks of constructing reglet, flashing and caulking.
DATE

September 28, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-5, BR-13 & FX-1

DOCUMENT CHANGE MEMO

DCA2010-SD-10

Standard Drawing GR-05 is required to update general notes. Standard Drawings PM-01 to PM-06 have been revised to comply with MUTCD 2009 and current design standards.
DATE

September 22, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

GR-05 and PM-01 – PM-06

DOCUMENT CHANGE MEMO

DCA2010-SD-09

Standard Drawings BR-15, E-14, E-21, E-22 and E-24 have been revised to accommodate changes in lighting design and equipment requirements.
DATE

September 15, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-15, E-14, E-21, E-22 and E-24

DOCUMENT CHANGE MEMO

DCA2010-SD-07

The new Standard Drawings ITS-1 through ITS-34 are new drawings which have been developed in support of Intelligent Transportation System (ITS) device and infrastructure installations.
DATE

September 15, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

ITS-1 through ITS-34

DOCUMENT CHANGE MEMO

DCA2010-SD-08

New Standard Drawings VM-17 through VM-22 for VM overhead sign structure with spans greater than 85 feet.
DATE

September 2, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-17 through VM-22

DOCUMENT CHANGE MEMO

DCA 2010-SD-06

Standard Drawing BR-13 has been revised to improve detailing based on current practices by the joint manufacturers and to reflect recent NJTA Design Manual changes.
DATE

July 28, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

BR-13

DOCUMENT CHANGE MEMO

DCA 2010-SD-05

Revisions to Standard Drawings VM-01, VM-02, VM-04 through VM-08, VM-10, VM-17, VM-18 and VM-20 through VM-22
DATE

June 30, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

VM-01, VM-02, VM-04 through VM-08, VM-10, VM-17, VM-18, VM-20 through VM-22

DOCUMENT CHANGE MEMO

DCA 2010-SD-04

New Standard Drawings CM-01 through CM-10 has been developed.
DATE

April 6, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

CM-01, CM-02, CM-03, CM-04, CM-05, CM-06, CM-07, CM-08, CM-09 and CM-10

DOCUMENT CHANGE MEMO

DCA 2010-SD-03

Standard Drawings for DATIM Enclosures, Sheets TB-8 through TB-11 have been developed.
DATE

March 3, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

Index-1, TB-8, TB-9, TB-10 and TB-11

DOCUMENT CHANGE MEMO

DCA 2010-SD-02

Revisions to Standard Drawings SI-13, SI-17, S-18B, VM-01, VM-08, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-09.
DATE

February 2, 2010

REVISED SECTION/ SUBSCRIPTION/ EXHIBIT

SI-13, SI-17, S-18B, VM-01, VM-08, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-09

DOCUMENT CHANGE MEMO

DCA2010-SD-01